Show on map
Camden Plant Holding LLC — Power plant · Gas, combined cycle · Camden Energy CenterEQUINIX — Large load · PA · 3.7 mi awayCROSS CONNECT SOLUTIONS — Built · Large load · PA · 3.7 mi away365 DATA CENTERS — Built · Large load · PA · 3.9 mi awayH5 DATA CENTERS — Built · Large load · PA · 3.9 mi awayDeptford Solar One — Postponed · Solar · NJ · 3 MW · 7.9 mi awayPettinos Solar — Postponed · Solar · NJ · 1.2 MW · 14.7 mi away
  • Combustion
  • Loads
  • Operating
  • Stage not stated
  • Size not stated
  • 10 · 100 · 1,000 MW

Camden Plant Holding LLC

Power plant · Gas, combined cycle

Key facts

Power plant · Gas, combined cycleran 6% of 2025 Operating
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
1993
Net generation, 2025
97,880 MWh
Grid
230 kV to Public Service Elec & Gas Co (PJM)
Location
Camden County, New Jersey

Output

Net generation MWh by year, 2001 to 2025
Fuel burned MMBtu by year, 2001 to 2025
  • Gas
  • Oil

Operations detail

Details

Who’s behind it

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Gas, combined cycle source: “Natural Gas Fired Combined Cycle”
Age
33 years since 1993
Unused energy
1,417 GWh 2025Unused energyA lead, not a guarantee: MW × hours × (1 − capacity factor) for the latest year (EIA-923), gas, coal and oil plants only. Air-permit run-hour caps, heat rate (cost to run) and capacity-market or reliability obligations can rule it out.
Heat rate
9,193 Btu/kWh 2025
All 8 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Gem
Parents
Name
PowerTransitions Buyer, LLC LLC
Share pct
100
Gem entity id
E100002024372
Unit ids
G100000401608
Location id
L100000401580
Eia plant ids
10751
Grid
Nerc region
RFC
Report year
2025
Grid voltage kv
230
Transmission owner
Public Service Elec & Gas Co
Balancing authority code
PJM
Balancing authority name
PJM Interconnection, LLC
EPA greenhouse gas reporting (GHGRP)
EPA FRS ID
110000321456
Subparts reported
C, D
NAICS code
221112
Subpart PP (CO2 supply)
No
Subpart RR (geologic sequestration)
No
Subpart UU (CO2 injection)
No
Reporting year
2023
GHGRP facility ID
1001226
Fuel burned (MMBtu), 2025899,846
Capacity factor, 20250.065
Heat rate (Btu/kWh), 20259,193.4
Net generation (MWh), 202597,880
Balancing authority codePJM

Ownership

3 companies3
Companies with an ownership or operating interest in this asset.
CompanyRoleShareAs ofSource
Camden Energy Center Operator EIA-860M
TALEN ENERGY CORP Owner 100.0% Dec 31, 2023 EPA GHGRP
Camden Plant Holdings, L.L.C. Owner 100.0% Dec 31, 2025 EIA-860

Timeline

  • In service · EIA-860M

Sources

6 sources

Sources EIA-860M · GEM · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory · EPA Greenhouse Gas Reporting Program — facility register with parent-company shares (Envirofacts pub_dim_facility; FLIGHT) · EIA-860 Annual Electric Generator Report — Schedule 4 Owner (ownership shares per generator), plus Plant/Generator schedules

Sources

Every source and license · Attribution

View at source

Around this plant

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
EQUINIX Unknown Large load 3.7 mi
CROSS CONNECT SOLUTIONS Built Large load 3.7 mi
365 DATA CENTERS Built Large load 3.9 mi
H5 DATA CENTERS Built Large load 3.9 mi
Deptford Solar One Postponed Solar 7.9 mi 3
Pettinos Solar Postponed Solar 14.7 mi 1.2

Sources EPA ICIS-Air · EIA-860M

Sources

Attribution