Show on map
Cameron Solar — Power plant · Solar · Cameron Solar, LLCShining Sun Solar — Permitted · Solar · SC · 74 MW · 8.1 mi awayUlmer Solar — Postponed · Solar · SC · 22 MW · 8.7 mi awayOrange County Biomass LLC — Postponed · Biomass · SC · 35 MW · 9.6 mi awayWSW Solar — Postponed · Solar · SC · 10.8 MW · 10.9 mi awayRowesville Rd Plant — Postponed · Gas, combustion turbine · SC · 9.6 MW · 12.5 mi awaySR Cordova — Permitted · Solar · SC · 100 MW · 13.1 mi away
  • Wind & solar
  • In development
  • Operating
  • 10 · 100 · 1,000 MW

Cameron Solar

Power plant · Solar

Key facts

Power plant · Solarran 22% of 2025 Operating
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
2017
Net generation, 2025
38,139 MWh
Grid
46 kV to Dominion Energy South Carolina (SCEG)
Location
Calhoun County, South Carolina
Operated by
Cameron Solar, LLCSourceEIA-860M Preliminary Monthly Electric Generator Inventory

Output

Net generation MWh by year, 2017 to 2026

Operations detail

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Solar source: “Solar Photovoltaic”
Age
9 years since 2017
All 6 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Gem
Unit ids
G100000805104
Location id
L100000804440
Eia plant ids
61489
Grid
Nerc region
SERC
Report year
2025
Grid voltage kv
46
Transmission owner
Dominion Energy South Carolina
Balancing authority code
SCEG
Balancing authority name
Dominion Energy South Carolina
Fuel burned (MMBtu), 2025130,131
Capacity factor, 20250.218
Net generation (MWh), 202538,139
Balancing authority codeSCEG

Solar arrays

Array area (acres)
151.3
AC capacity (MW)
20
DC capacity (MW)
28
Mounting
Single-axis tracking
Site type
Greenfield
Began operating
2017

Source USPVDB

Source

  • USPVDBOpen license · retrieved Oct 25, 2026Map services and data are available from Large-Scale Solar Photovoltaic Database, provided by the U.S. Geological Survey and Lawrence Berkeley National Laboratory via https://energy.usgs.gov/uspvdb

Attribution

Timeline

  • In service · EIA-860M

Sources

5 sources

Sources EIA-860M · GEM · USPVDB · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026
  • GEMOpen license, with credit · retrieved Oct 26, 2026Global Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.
  • USPVDBOpen license · retrieved Oct 25, 2026Map services and data are available from Large-Scale Solar Photovoltaic Database, provided by the U.S. Geological Survey and Lawrence Berkeley National Laboratory via https://energy.usgs.gov/uspvdb
  • EIAOpen license · retrieved Nov 1, 2026Source: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)
  • EIA-860M Preliminary Monthly Electric Generator Inventory

Every source and license · Attribution

View at source

Around this plant

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
Shining Sun Solar Permitted Solar 8.1 mi 74
Ulmer Solar Postponed Solar 8.7 mi 22
Orange County Biomass LLC Postponed Biomass 9.6 mi 35
WSW Solar Postponed Solar 10.9 mi 10.8
Rowesville Rd Plant Postponed Gas, combustion turbine 12.5 mi 9.6
SR Cordova Permitted Solar 13.1 mi 100

Sources EIA-860M

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026

Attribution