Show on map
Candlers Mountain - Smith Mountain 138 kV — Transmission lineCENTRA HEALTH ADMINISTRATION - DATA CENT — Built · Large load · VA · 6.1 mi awayGladys Solar LLC — Announced · Solar · VA · 60.4 MW · 7.8 mi awayPigeon Run Solar Project — Announced · Solar · VA · 60 MW · 11.2 mi away
  • Wind & solar
  • Loads
  • In development
  • Operating
  • Size not stated
  • Other infrastructure
  • 10 · 100 · 1,000 MW

Candlers Mountain - Smith Mountain 138 kV

Transmission line

Mapped route length
Mapped route length: sourceLBNL · Open license, with creditmiles
Voltage
138 kV
States crossed
US-VA
Owner (as stated)
Appalachian Power

Details

Who’s behind it

Owner
Appalachian Power

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Mapped route length (miles)
29
Substations at the ends (as the source names them)
Candlers Mountain to Smith Mountain
All 3 attributes from LBNL — A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024 (OEDI submission 8742)
Attributes
AttributeValue
Owner, as the source states itappalachian power
HIFLD line ID120410
Voltage class100-161 kV

Sources

1 source

Sources LBNL

Sources

  • LBNLOpen license, with credit · retrieved Nov 13, 2026Yin, Nait Belaid & Heleno (2026), Lawrence Berkeley National Laboratory, OEDI, CC BY 4.0: A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024. Modified by Inframation: HIFLD-side fields only, names re-cased, coordinates rounded.

Every source and license · Attribution

View at source

Around this line

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
CENTRA HEALTH ADMINISTRATION - DATA CENT Built Large load 6.1 mi
Gladys Solar LLC Announced Solar 7.8 mi 60.4
Pigeon Run Solar Project Announced Solar 11.2 mi 60

Sources EPA ICIS-Air · EIA-860M

Sources

Attribution