Carbon Limestone

Power plant · Biomass

Key facts

Power plant · Biomassran 30% of 2022 Retired
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
2001
Net generation, 2022
67,304 MWh
Grid
69 kV to Ohio Edison Co (PJM)
Location
Mahoning County, Ohio

Output

Net generation MWh by year, 2008 to 2023
Fuel burned MMBtu by year, 2008 to 2023
  • Biomass and waste

Operations detail

Details

Who’s behind it

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Biomass source: “Landfill Gas”
Age
25 years since 2001
All 2 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
EPA greenhouse gas reporting (GHGRP)
EPA FRS ID
110008615294
Subparts reported
C, HH
NAICS code
562212
Subpart PP (CO2 supply)
No
Subpart RR (geologic sequestration)
No
Subpart UU (CO2 injection)
No
Reporting year
2023
GHGRP facility ID
1003102
Balancing authority codePJM

Retirement

EIA-860M September 2026StatusEvery generator EIA lists at this plant has retired. As of EIA-860M for September 2026.
Retired
December 2022
Capacity retired
25.6 MW
Generators retired
18
Generators that retired or are scheduled to retire
GeneratorTechnologyNameplateStateDate
1Landfill Gas1.4 MWRetiredDecember 2022
10Landfill Gas1.4 MWRetiredDecember 2022
11Landfill Gas1.4 MWRetiredDecember 2022
12Landfill Gas1.4 MWRetiredDecember 2022
13Landfill Gas1.4 MWRetiredDecember 2022
14Landfill Gas1.4 MWRetiredDecember 2022
15Landfill Gas1.4 MWRetiredDecember 2022
16Landfill Gas1.4 MWRetiredDecember 2022
17Landfill Gas1.6 MWRetiredDecember 2022
18Landfill Gas1.6 MWRetiredDecember 2022
2Landfill Gas1.4 MWRetiredDecember 2022
3Landfill Gas1.4 MWRetiredDecember 2022
4Landfill Gas1.4 MWRetiredDecember 2022
5Landfill Gas1.4 MWRetiredDecember 2022
6Landfill Gas1.4 MWRetiredDecember 2022
7Landfill Gas1.4 MWRetiredDecember 2022
8Landfill Gas1.4 MWRetiredDecember 2022
9Landfill Gas1.4 MWRetiredDecember 2022

Grid

EIA-860 2025Grid fieldsAs the plant reported them to EIA-860 for 2025 (Schedule 2).
Grid voltage at the plant
69 kV
Transmission or distribution system owner
Ohio Edison Co
Balancing authority
PJM Interconnection, LLC
NERC region
RFC
Transmission lines within 15 mi (10)
Can the connection be reused?

A plant that retires usually leaves its substation, transmission connection and interconnection agreement behind, and those may be reusable by a new project at the same site. FERC Order No. 845 lets an interconnection customer use surplus interconnection service at an existing site, and some transmission providers' tariffs let a replacement resource take over a retiring unit's interconnection service, usually within a set time after the retirement. Whether any such right still exists here, who holds it and on what terms depends on the owner, the transmission provider and timing; this page does not establish any of that.

Ownership

2 companies2
Companies with an ownership or operating interest in this asset.
CompanyRoleShareAs ofSource
Energy Developments, Inc d/b/a EDL Operator EIA-860M
REPUBLIC SERVICES INC Owner 100.0% Dec 31, 2023 EPA GHGRP

Timeline

  • Stated Units 1, 10, 11, 12, 13, 14, 15, 16, 17, 18, 2, 3, 4, 5, 6, 7, 8, 9 scheduled to retire, 25.6 MW · EIA-860M
  • In service · EIA-860M

Sources

5 sources

Sources EIA-860M · LBNL · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory · EPA Greenhouse Gas Reporting Program — facility register with parent-company shares (Envirofacts pub_dim_facility; FLIGHT)

Sources

Every source and license · Attribution

View at source

Around this plant

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
Firefly Solar PA Filed Solar 6.5 mi 401.6
Mahoning Postponed Biomass 6.7 mi 0.8
Matador Solar Postponed Solar + storage 12.0 mi 300

Sources EIA-860M

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026