Show on map
- Wind & solar
- Under construction
- Other infrastructure
- 10 · 100 · 1,000 MW
Map
- Wind & solar
- Under construction
- Other infrastructure
Cardinal - North Madison 138 kV: route and 6 exact-grade projects within 15 mi. Basemap: Protomaps, © OpenStreetMap contributors, ODbL.
Cardinal - North Madison 138 kV
Transmission line
- Mapped route length
- Mapped route length: sourceLBNL · Open license, with creditmiles
- Voltage
- 138 kV
- States crossed
- US-WI
- Owner (as stated)
- American Transmission
Details
Who’s behind it
- Owner
- American Transmission
Interested in this project?
Set an alert Book a call Join the beta
Our team gets you what you need.
Beta: private project space · data room · readiness check
- Mapped route length (miles)
- 21
- Substations at the ends (as the source names them)
- Cardinal to North Madison
All 3 attributes from LBNL — A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024 (OEDI submission 8742)
| Attribute | Value |
|---|---|
| Owner, as the source states it | american transmission |
| HIFLD line ID | 121475 |
| Voltage class | 100-161 kV |
Sources
1 sourceSources LBNL
Sources
- LBNLYin, Nait Belaid & Heleno (2026), Lawrence Berkeley National Laboratory, OEDI, CC BY 4.0: A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024. Modified by Inframation: HIFLD-side fields only, names re-cased, coordinates rounded.
Around this line
Nearby
within 15 mi| Project | Kind | Away | MW |
|---|---|---|---|
| Vienna Walbec Customer Hosted Under construction | Solar | 3.3 mi | 1.4 |
| Pine Hill Solar Under construction | Solar | 3.9 mi | 6 |
| High Noon Solar Energy LLC Under construction | Solar | 7.5 mi | 300 |
| UW Madison Charter Street Plant Postponed | Biomass | 8.6 mi | 22 |
| Sunnyside Solar Energy Center Under construction | Solar + storage | 9.9 mi | 60 |
| Nine Springs Solar Under construction | Solar | 11.2 mi | 8 |
Sources EIA-860M