Show on map
Cardinal — Power plant · Coal · Cardinal Operating CompanySteubenville Solar — Solar · OH · 43 MW · 11.2 km awayPike Island Hydroelectric Project — Hydro · OH · 20 MW · 12.3 km awayESC Brooke County Power I — Gas, combined cycle · WV · 841.5 MW · 14.3 km awayWylie Ridge Solar — Solar · WV · 8.4 MW · 23.2 km away
  • Combustion
  • Clean firm
  • Wind & solar
  • In development
  • Operating
  • 10 · 100 · 1,000 MW

Power plant · Coal

Key facts

Power plant · Coalran 66% of 2025 Operating
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
1967
Net generation, 2025
10,816,272 MWh
Grid
345 kV, 138 kV to Ohio Power Co (PJM)
Location
Jefferson County, Ohio

Output

Net generation MWh by year, 2001 to 2026
Fuel burned MMBtu by year, 2001 to 2026
  • Coal
  • Oil

Operations detail

Details

Who’s behind it

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Coal source: “Conventional Steam Coal”
Age
59 years since 1967
Unused energy
5,657 GWh 2025Unused energyA lead, not a guarantee: MW × hours × (1 − capacity factor) for the latest year (EIA-923), gas, coal and oil plants only. Air-permit run-hour caps, heat rate (cost to run) and capacity-market or reliability obligations can rule it out.
Heat rate
10,071 Btu/kWh 2025
All 7 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Gem
Parents
Name
Buckeye Power Inc
Share pct
100
Gem entity id
E100000002188
Unit ids
G100000101217, G100000101218, G100000101219
Location id
L100000104103
EPA greenhouse gas reporting (GHGRP)
EPA FRS ID
110000605426
Subparts reported
C, D
NAICS code
221112
Subpart PP (CO2 supply)
No
Subpart RR (geologic sequestration)
No
Subpart UU (CO2 injection)
No
Reporting year
2023
GHGRP facility ID
1000839
Fuel burned (MMBtu), 2025108,926,531
Capacity factor, 20250.657
Heat rate (Btu/kWh), 202510,070.6
Net generation (MWh), 202510,816,272.0
Balancing authority codePJM

Retirement

EIA-860M September 2026StatusSome generators are scheduled to retire; most of the plant's capacity is not, so it is shown as operating. As of EIA-860M for September 2026.
Next scheduled retirement
December 2028
Capacity scheduled to retire
650 MW
Generators scheduled to retire
1
Share of in-service capacity scheduled
35%
Capacity still in service
1,880.4 MW
Generators that retired or are scheduled to retire
GeneratorTechnologyNameplateStateDate
3Conventional Steam Coal650 MWScheduled to retireDecember 2028

Grid

EIA-860 2025Grid fieldsAs the plant reported them to EIA-860 for 2025 (Schedule 2).
Grid voltage at the plant
345 kV, 138 kV
Transmission or distribution system owner
Ohio Power Co
Balancing authority
PJM Interconnection, LLC
NERC region
RFC
Transmission lines within 25 km (10)
Can the connection be reused?

A plant that retires usually leaves its substation, transmission connection and interconnection agreement behind, and those may be reusable by a new project at the same site. FERC Order No. 845 lets an interconnection customer use surplus interconnection service at an existing site, and some transmission providers' tariffs let a replacement resource take over a retiring unit's interconnection service, usually within a set time after the retirement. Whether any such right still exists here, who holds it and on what terms depends on the owner, the transmission provider and timing; this page does not establish any of that.

Ownership

2 companies3
Companies with an ownership or operating interest in this asset.
CompanyRoleShareAs ofSource
Cardinal Operating Company Operator EIA-860M
Buckeye Power, Inc Owner 100.0% 31 Dec 2023 EPA GHGRP
Buckeye Power, Inc Owner 100.0% 31 Dec 2025 EIA-860

Timeline

  • Stated Unit 3 scheduled to retire, 650 MW · EIA-860M
  • In service · EIA-860M

Sources

7 sources

Sources EIA-860M · GEM · LBNL · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory · EPA Greenhouse Gas Reporting Program — facility register with parent-company shares (Envirofacts pub_dim_facility; FLIGHT) · EIA-860 Annual Electric Generator Report — Schedule 4 Owner (ownership shares per generator), plus Plant/Generator schedules

Sources

Every source and license · Attribution

View at source

Around this plant

Nearby

within 25 km
Projects within 25 km, nearest first.
ProjectKindAwayMW
Steubenville Solar Announced Solar 11.2 km 43
Pike Island Hydroelectric Project Filed Hydro 12.3 km 20
ESC Brooke County Power I Postponed Gas, combined cycle 14.3 km 841.5
Wylie Ridge Solar Filed Solar 23.2 km 8.4

Sources EIA-860M

Sources

Attribution