- Combustion
- Loads
- In development
- Operating
- Retired
- Size not stated
- 10 · 100 · 1,000 MW
Map
- Combustion
- Loads
- In development
- Operating
- Retired
- Size not stated
Cargill Corn Wet Milling Plant: location and 4 exact-grade projects within 15 mi. Basemap: Protomaps, © OpenStreetMap contributors, ODbL.
Cargill Corn Wet Milling Plant
Power plant · Coal
Key facts
Power plant · Coalran 1% of 2015 Retired- Capacity
- Capacity: sourceEIA-860M · Open licenseMW
- Commissioned
- 1985
- Net generation, 2015
- 2,193 MWh
- Location
- Shelby County, Tennessee
- Operated by
- Cargill Inc.SourceEIA-860M Preliminary Monthly Electric Generator Inventory
Output
- Gas
- Coal
Details
Who’s behind it
- Owner
- Cargill Inc.Source100.0%, EPA Greenhouse Gas Reporting Program — facility register with parent-company shares (Envirofacts pub_dim_facility; FLIGHT), as of Dec 31, 2023
Interested in this project?
- Technology
- Coal source: “Conventional Steam Coal”
- Age
- 41 years since 1985
All 2 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
| Attribute | Value |
|---|---|
| EPA greenhouse gas reporting (GHGRP) |
|
| Balancing authority code | TVA |
Retirement
EIA-860M September 2026StatusEvery generator EIA lists at this plant has retired. As of EIA-860M for September 2026.- Retired
- February 2015
- First unit retired
- April 2010
- Capacity retired
- 29.8 MW
- Generators retired
- 2
| Generator | Technology | Nameplate | State | Date |
|---|---|---|---|---|
| GEN2 | Natural Gas Fired Combustion Turbine | 4.8 MW | Retired | April 2010 |
| GEN1 | Conventional Steam Coal | 25 MW | Retired | February 2015 |
By technology
| Technology | Retired | Scheduled to retire |
|---|---|---|
| Conventional Steam Coal | 25 MW | |
| Natural Gas Fired Combustion Turbine | 4.8 MW |
Grid
EIA-860Grid fieldsAs the plant reported them to EIA-860 (Schedule 2).- Balancing authority
- TVA
Transmission lines within 15 mi (10)
- West Memphis Substation - Keo Substation 500 kV
- West Memphis Substation 161 kV line
- Lehi - West Memphis Substation 161 kV
- West Memphis Substation - Floyd Frog Hudson Station 161 kV
- West Memphis Gateway 161 kV line
- Freeport - Horn Lake 161 kV
- Freeport - Twinkletown 230 kV
- Southgate - Northeast Gate 161 kV
- Enterprise Energy Facility - Freeport 230 kV
- Freeport - Horn Lake 230 kV
Can the connection be reused?
A plant that retires usually leaves its substation, transmission connection and interconnection agreement behind, and those may be reusable by a new project at the same site. FERC Order No. 845 lets an interconnection customer use surplus interconnection service at an existing site, and some transmission providers' tariffs let a replacement resource take over a retiring unit's interconnection service, usually within a set time after the retirement. Whether any such right still exists here, who holds it and on what terms depends on the owner, the transmission provider and timing; this page does not establish any of that.
Timeline
- Stated Unit GEN1 scheduled to retire, 25 MW · EIA-860M
- Stated Unit GEN2 scheduled to retire, 4.8 MW · EIA-860M
- In service · EIA-860M
Sources
5 sourcesSources EIA-860M · LBNL · EIA · EPA Greenhouse Gas Reporting Program — facility register with parent-company shares (Envirofacts pub_dim_facility; FLIGHT) · EIA-860M Preliminary Monthly Electric Generator Inventory
Sources
- EIA-860M
- LBNLYin, Nait Belaid & Heleno (2026), Lawrence Berkeley National Laboratory, OEDI, CC BY 4.0: A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024. Modified by Inframation: HIFLD-side fields only, names re-cased, coordinates rounded.
- EIASource: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)
- EPA Greenhouse Gas Reporting Program — facility register with parent-company shares (Envirofacts pub_dim_facility; FLIGHT)
- EIA-860M Preliminary Monthly Electric Generator Inventory
Around this plant
Nearby
within 15 mi| Project | Kind | Away | MW |
|---|---|---|---|
| COLOSSUS DATA CENTER Built | Large load | 1.9 mi | |
| 330T - Gun Range Datacenter Filed | Large load | 8.8 mi | |
| 5C MEM01 INC Built | Large load | 11.7 mi | |
| OPPIDAN DATA CENTER Built | Large load | 14.4 mi |
Sources EPA ICIS-Air · FAA OE/AAA · EPA ICIS-NPDES