Show on map
COLOSSUS DATA CENTER330T - Gun Range Datacenter — Filed · Large load · MS · 8.4 mi away5C MEM01 INC — Built · Large load · TN · 12.3 mi away
  • Loads
  • In development
  • Operating
  • Size not stated
  • 10 · 100 · 1,000 MW

Colossus Data Center

Data center

As filed: COLOSSUS DATA CENTER

Kind
Data center
Location
Shelby County, Tennessee

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Kind
Data center source: “Data Center”
Capacity (MW)
Not stated
  • Selected as a data center because the facility name says data center. EPA ECHO ICIS-Air national facility download (data-centre selection, placed through FRS)

Timeline

  • Observed as built in EPA ICIS-Air (source status: “Operating”).

“Stated” dates are the source’s plan, not a commitment.

About these dates

Status and dates as the source last listed them. Later changes follow as we see them.

Sources

1 source

Sources EPA ICIS-Air

Sources

Every source and license · Attribution

View at source

Report a problem

Around this project

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
330T - Gun Range Datacenter Filed Large load 8.4 mi
5C MEM01 INC Built Large load 12.3 mi

Sources FAA OE/AAA · EPA ICIS-Air

Sources

Attribution