Carmen Smith
Power plant · Hydro
Key facts
Power plant · Hydroran 17% of 2025 Operating- Capacity
- Capacity: sourceEIA-860M · Open licenseMW
- Commissioned
- 1963
- Net generation, 2025
- 167,869 MWh
- Grid
- 115 kV to City of Eugene - (OR) (BPAT)
- Location
- Linn County, Oregon
- Operated by
- Eugene Water & Electric BoardSourceEIA-860M Preliminary Monthly Electric Generator Inventory
Output
Details
Who’s behind it
No companies named in filings yet.
Interested in this project?
Set an alert Book a call Join the beta
Our team gets you what you need.
Beta: private project space · data room · readiness check
- Technology
- Hydro source: “Conventional Hydroelectric”
- Age
- 63 years since 1963
All 6 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
| Attribute | Value |
|---|---|
| Gem |
|
| Eia status |
|
| Fuel burned (MMBtu), 2025 | 572,771 |
| Capacity factor, 2025 | 0.168 |
| Net generation (MWh), 2025 | 167,869 |
| Balancing authority code | BPAT |
Retirement
EIA-860M September 2026StatusSome generators are scheduled to retire; most of the plant's capacity is not, so it is shown as operating. As of EIA-860M for September 2026.- Next scheduled retirement
- October 2030
- Capacity scheduled to retire
- 9.9 MW
- Generators scheduled to retire
- 1
- Share of in-service capacity scheduled
- 9%
- Capacity still in service
- 114.3 MW
| Generator | Technology | Nameplate | State | Date |
|---|---|---|---|---|
| 3 | Conventional Hydroelectric | 9.9 MW | Scheduled to retire | October 2030 |
Grid
EIA-860 2025Grid fieldsAs the plant reported them to EIA-860 for 2025 (Schedule 2).- Grid voltage at the plant
- 115 kV
- Transmission or distribution system owner
- City of Eugene - (OR)
- Balancing authority
- Bonneville Power Administration
- NERC region
- WECC
Can the connection be reused?
A plant that retires usually leaves its substation, transmission connection and interconnection agreement behind, and those may be reusable by a new project at the same site. FERC Order No. 845 lets an interconnection customer use surplus interconnection service at an existing site, and some transmission providers' tariffs let a replacement resource take over a retiring unit's interconnection service, usually within a set time after the retirement. Whether any such right still exists here, who holds it and on what terms depends on the owner, the transmission provider and timing; this page does not establish any of that.
Timeline
- Stated Unit 3 scheduled to retire, 9.9 MW · EIA-860M
- In service · EIA-860M
Sources
4 sourcesSources EIA-860M · GEM · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory
Sources
- EIA-860M
- GEMGlobal Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.
- EIASource: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)
- EIA-860M Preliminary Monthly Electric Generator Inventory