Carmen Smith — Power plant · Hydro · Eugene Water & Electric Board
  • Clean firm
  • Operating
  • 10 · 100 · 1,000 MW

Carmen Smith

Power plant · Hydro

Key facts

Power plant · Hydroran 17% of 2025 Operating
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
1963
Net generation, 2025
167,869 MWh
Grid
115 kV to City of Eugene - (OR) (BPAT)
Location
Linn County, Oregon
Operated by
Eugene Water & Electric BoardSourceEIA-860M Preliminary Monthly Electric Generator Inventory

Output

Net generation MWh by year, 2001 to 2025

Operations detail

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Hydro source: “Conventional Hydroelectric”
Age
63 years since 1963
All 6 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Gem
Unit ids
G100000603793
Location id
L100000603755
Eia status
By code
OA
Mw
52.20
Units
1
OP
Mw
62.10
Units
2
Standby mw
0
Status rule
some_units_retiring
In service mw
114.3
Out of service mw
52.20
Fuel burned (MMBtu), 2025572,771
Capacity factor, 20250.168
Net generation (MWh), 2025167,869
Balancing authority codeBPAT

Retirement

EIA-860M September 2026StatusSome generators are scheduled to retire; most of the plant's capacity is not, so it is shown as operating. As of EIA-860M for September 2026.
Next scheduled retirement
October 2030
Capacity scheduled to retire
9.9 MW
Generators scheduled to retire
1
Share of in-service capacity scheduled
9%
Capacity still in service
114.3 MW
Generators that retired or are scheduled to retire
GeneratorTechnologyNameplateStateDate
3Conventional Hydroelectric9.9 MWScheduled to retireOctober 2030

Grid

EIA-860 2025Grid fieldsAs the plant reported them to EIA-860 for 2025 (Schedule 2).
Grid voltage at the plant
115 kV
Transmission or distribution system owner
City of Eugene - (OR)
Balancing authority
Bonneville Power Administration
NERC region
WECC
Can the connection be reused?

A plant that retires usually leaves its substation, transmission connection and interconnection agreement behind, and those may be reusable by a new project at the same site. FERC Order No. 845 lets an interconnection customer use surplus interconnection service at an existing site, and some transmission providers' tariffs let a replacement resource take over a retiring unit's interconnection service, usually within a set time after the retirement. Whether any such right still exists here, who holds it and on what terms depends on the owner, the transmission provider and timing; this page does not establish any of that.

Timeline

  • Stated Unit 3 scheduled to retire, 9.9 MW · EIA-860M
  • In service · EIA-860M

Sources

4 sources

Sources EIA-860M · GEM · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026
  • GEMOpen license, with credit · retrieved Oct 26, 2026Global Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.
  • EIAOpen license · retrieved Nov 1, 2026Source: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)