Show on map
CE Leathers — Power plant · Geothermal · CalEnergy Operating CorporationHudson Ranch Power II LLC — Postponed · Geothermal · CA · 55 MW · 3.1 km awayBlack Rock I — Postponed · Geothermal · CA · 70 MW · 5.0 km awayBlack Rock II — Postponed · Geothermal · CA · 70 MW · 5.0 km awayBlack Rock III — Postponed · Geothermal · CA · 70 MW · 5.0 km away
  • Clean firm
  • Operating
  • 10 · 100 · 1,000 MW

CE Leathers

Power plant · Geothermal

Key facts

Power plant · Geothermalran 68% of 2025 Operating
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
1989
Net generation, 2025
270,503 MWh
Grid
92 kV to Imperial Irrigation District (IID)
Location
Imperial County, California

Output

Net generation MWh by year, 2001 to 2025

Operations detail

Details

Who’s behind it

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Geothermal source: “Geothermal”
Age
37 years since 1989
All 6 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Gem
Unit ids
G100000700036
Location id
L100000700025
Eia plant ids
10631
Grid
Nerc region
WECC
Report year
2025
Grid voltage kv
92
Transmission owner
Imperial Irrigation District
Balancing authority code
IID
Balancing authority name
Imperial Irrigation District
Fuel burned (MMBtu), 2025922,958
Capacity factor, 20250.679
Net generation (MWh), 2025270,503
Balancing authority codeIID

Ownership

2 companies2
Companies with an ownership or operating interest in this asset.
CompanyRoleShareAs ofSource
CalEnergy Operating Corporation Operator EIA-860M
CE Generation Owner 100.0% Dec 31, 2025 EIA-860

Timeline

  • In service · EIA-860M

Sources

5 sources

Sources EIA-860M · GEM · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory · EIA-860 Annual Electric Generator Report — Schedule 4 Owner (ownership shares per generator), plus Plant/Generator schedules

Sources

Every source and license · Attribution

View at source

Around this plant

Nearby

within 25 km
Projects within 25 km, nearest first.
ProjectKindAwayMW
Hudson Ranch Power II LLC Postponed Geothermal 3.1 km 55
Black Rock I Postponed Geothermal 5.0 km 70
Black Rock II Postponed Geothermal 5.0 km 70
Black Rock III Postponed Geothermal 5.0 km 70

Sources EIA-860M

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026

Attribution