- Wind & solar
- Operating
- 10 · 100 · 1,000 MW
Map
- Wind & solar
- Operating
CED Ducor 1: location. Basemap: Protomaps, © OpenStreetMap contributors, ODbL.
CED Ducor 1
Power plant · Solar
Key facts
Power plant · Solarran 30% of 2025 Operating- Capacity
- Capacity: sourceEIA-860M · Open licenseMW
- Commissioned
- 2016
- Net generation, 2025
- 52,334 MWh
- Grid
- 66 kV to Southern California Edison Co (CISO)
- Location
- Tulare County, California
- Operated by
- RWE Americas, LLCSourceEIA-860M Preliminary Monthly Electric Generator Inventory
Operations
- Net generation, 2025
- 52,334
MWh - Fuel burned, 2025
- 178,563
MMBtu - Capacity factor, 2025
- 29.9
% - Heat rate, 2025
- Not stated
| Year | Net generation (MWh) | Fuel burned (MMBtu) | Capacity factor | Heat rate (Btu/kWh) |
|---|---|---|---|---|
| 2025 | 52,334 | 178,563 | 29.9% | — |
| 2024 | 51,855 | 176,931 | 29.5% | — |
| 2023 | 47,722 | 162,826 | 27.2% | — |
| 2022 | 46,031 | 157,056 | 26.3% | — |
| 2021 | 48,284 | 427,024 | 27.6% | — |
| 2020 | 49,767 | 436,307 | 28.3% | — |
| 2019 | 46,736 | 416,185 | 26.7% | — |
| 2018 | 52,444 | 477,449 | 29.9% | — |
| 2017 | 53,578 | 493,615 | 30.6% | — |
| 2016 (1 of 12 months) | 2,193 | 20,246 | — | — |
How these are worked out
Net generation and fuel burned are the monthly figures EIA publishes in its bulk electricity file, from the plant's Form 923 reports; a year is the sum of its months. Capacity factor is a full year's net generation over today's nameplate capacity times the hours in that year (8,784 in a leap year), so a plant uprated or partly retired since reads against its current size; heat rate is fuel burned over net generation, for plants that burn fuel. A year with fewer than twelve months stated has no capacity factor, and a value outside the plausible range is left blank rather than shown. By month, the charts apply the same rules to each month's own hours and fuel.