- Wind & solar
- Operating
- 10 · 100 · 1,000 MW
Map
- Wind & solar
- Operating
CED Ducor 4: location. Basemap: Protomaps, © OpenStreetMap contributors, ODbL.
CED Ducor 4
Power plant · Solar
Key facts
Power plant · Solarran 30% of 2025 Operating- Capacity
- Capacity: sourceEIA-860M · Open licenseMW
- Commissioned
- 2016
- Net generation, 2025
- 51,797 MWh
- Grid
- 66 kV to Southern California Edison Co (CISO)
- Location
- Tulare County, California
- Operated by
- RWE Americas, LLCSourceEIA-860M Preliminary Monthly Electric Generator Inventory
Operations
- Net generation, 2025
- 51,797
MWh - Fuel burned, 2025
- 176,732
MMBtu - Capacity factor, 2025
- 29.6
% - Heat rate, 2025
- Not stated
| Year | Net generation (MWh) | Fuel burned (MMBtu) | Capacity factor | Heat rate (Btu/kWh) |
|---|---|---|---|---|
| 2025 | 51,797 | 176,732 | 29.6% | — |
| 2024 | 51,555 | 175,907 | 29.3% | — |
| 2023 | 46,909 | 160,052 | 26.8% | — |
| 2022 | 46,291 | 157,944 | 26.4% | — |
| 2021 | 47,964 | 424,193 | 27.4% | — |
| 2020 | 48,698 | 426,935 | 27.7% | — |
| 2019 | 46,505 | 414,128 | 26.5% | — |
| 2018 | 52,343 | 476,531 | 29.9% | — |
| 2017 | 53,414 | 492,103 | 30.5% | — |
| 2016 (1 of 12 months) | 1,652 | 15,251 | — | — |
How these are worked out
Net generation and fuel burned are the monthly figures EIA publishes in its bulk electricity file, from the plant's Form 923 reports; a year is the sum of its months. Capacity factor is a full year's net generation over today's nameplate capacity times the hours in that year (8,784 in a leap year), so a plant uprated or partly retired since reads against its current size; heat rate is fuel burned over net generation, for plants that burn fuel. A year with fewer than twelve months stated has no capacity factor, and a value outside the plausible range is left blank rather than shown. By month, the charts apply the same rules to each month's own hours and fuel.