Cenergy IL - Zion CSG
Power plant · Solar
Key facts
Power plant · Solarran 0% of 2025 Operating- Capacity
- Capacity: sourceEIA-860M · Open licenseMW
- Commissioned
- 2025
- Net generation, 2025
- 13 MWh
- Grid
- 2 kV to Commonwealth Edison Co (PJM)
- Location
- Lake County, Illinois
- Operated by
- Standard SolarSourceEIA-860M Preliminary Monthly Electric Generator Inventory
Output
Details
Who’s behind it
No companies named in filings yet.
Interested in this project?
Set an alert Book a call Join the beta
Our team gets you what you need.
Beta: private project space · data room · readiness check
- Technology
- Solar source: “Solar Photovoltaic”
- Age
- 1 year since 2025
All 5 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
| Attribute | Value |
|---|---|
| Grid |
|
| Fuel burned (MMBtu), 2025 | 44 |
| Capacity factor, 2025 | 0.001 |
| Net generation (MWh), 2025 | 13 |
| Balancing authority code | PJM |
Timeline
- In service · EIA-860M
Sources
3 sourcesSources EIA-860M · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory
Sources
- EIA-860M
- EIASource: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)
- EIA-860M Preliminary Monthly Electric Generator Inventory
Around this plant
Nearby
within 15 mi| Project | Kind | Away | MW |
|---|---|---|---|
| Cenergy IL - Zion Park District Under construction | Solar | 0.1 mi | 2.3 |
| NL IL Lake Under construction | Solar | 2.1 mi | 5 |
| Zion Energy Center Postponed | Gas, combustion turbine | 2.5 mi | 397.8 |
| IL - Renewable Properties - Bobcat - Wes Under construction | Solar | 4.1 mi | 4.5 |
| Red Oak Ridge Energy Center LLC Studied | Gas, other | 13.0 mi | 1,211.2 |
| T5 CHI IV Data Center Buildings Filed | Large load | 14.6 mi | |
| 2250 (Racine data centre) Filed | Large load | 14.7 mi | |
| T5@CHICAGO IV, LP Built | Large load | 14.8 mi | |
| MICROSOFT CORPORATION - MKE 3B DATA CENTER Built | Large load | 14.8 mi |
Sources EIA-860M · Berkeley Lab · FAA OE/AAA · EPA ICIS-Air
Sources
- EIA-860M
- Berkeley LabLawrence Berkeley National Laboratory and GridTracker, Queued Up data file (2026 edition), CC BY 4.0. Modified by Inframation: non-ISO and MISO regions only; MISO rows labelled with the date the file's queue data runs to; statuses and technologies mapped to Inframation's vocabulary. Queued Up Data File. Copyright (c) 2026, The Regents of the University of California, through Lawrence Berkeley National Laboratory (subject to receipt of any required approvals from the U.S. Dept. of Energy) & GridTracker.
- FAA OE/AAA
- EPA ICIS-Air