Central Plant

Power plant · Oil

Key facts

Power plant · Oil Standby
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
1978
Net generation, 2025
0 MWh
Grid
4 kV to Duke Energy Carolinas, LLC (DUK)
Location
GREENVILLE County, South Carolina
Operated by
Bob Jones UniversitySourceEIA-860M Preliminary Monthly Electric Generator Inventory

Output

Net generation MWh by year, 2001 to 2025
Fuel burned MMBtu by year, 2001 to 2025
  • Gas
  • Oil

Operations detail

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Oil source: “Petroleum Liquids”
Age
48 years since 1978
All 4 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Eia status
By code
SB
Mw
4.10
Units
4
Standby mw
4.10
Status rule
majority_mw_standby
In service mw
4.10
Out of service mw
0
Fuel burned (MMBtu), 20250
Net generation (MWh), 20250
Balancing authority codeDUK
Data notes (1)
  • Capacity factor, 2025 not shown: net generation 0.0 MWh is not positive (the plant consumed at least as much as it produced over the year)

Retirement

Capacity retired
3.3 MW
Generators retired
3
Capacity still in service
4.1 MW
Generators that retired or are scheduled to retire
GeneratorTechnologyNameplateStateDate
ENG3Natural Gas Internal Combustion Engine1.1 MWRetiredJune 2015
ENG2Natural Gas Internal Combustion Engine1.1 MWRetiredJanuary 2016
ENG4Natural Gas Internal Combustion Engine1.1 MWRetiredJanuary 2016

Grid

EIA-860 2025Grid fieldsAs the plant reported them to EIA-860 for 2025 (Schedule 2).
Grid voltage at the plant
4 kV
Transmission or distribution system owner
Duke Energy Carolinas, LLC
Balancing authority
Duke Energy Carolinas
NERC region
SERC
Transmission lines within 15 mi (10)
Can the connection be reused?

A plant that retires usually leaves its substation, transmission connection and interconnection agreement behind, and those may be reusable by a new project at the same site. FERC Order No. 845 lets an interconnection customer use surplus interconnection service at an existing site, and some transmission providers' tariffs let a replacement resource take over a retiring unit's interconnection service, usually within a set time after the retirement. Whether any such right still exists here, who holds it and on what terms depends on the owner, the transmission provider and timing; this page does not establish any of that.

Timeline

  • Stated Units ENG2, ENG4 scheduled to retire, 2.2 MW · EIA-860M
  • Stated Unit ENG3 scheduled to retire, 1.1 MW · EIA-860M
  • In service · EIA-860M

Sources

4 sources

Sources EIA-860M · LBNL · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026
  • LBNLOpen license, with credit · retrieved Nov 13, 2026Yin, Nait Belaid & Heleno (2026), Lawrence Berkeley National Laboratory, OEDI, CC BY 4.0: A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024. Modified by Inframation: HIFLD-side fields only, names re-cased, coordinates rounded.
  • EIAOpen license · retrieved Nov 1, 2026Source: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)
  • EIA-860M Preliminary Monthly Electric Generator Inventory

Every source and license · Attribution

View at source

Around this plant

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
DC Blox Inc Data Center Expansion Built Large load 4.6 mi
Webster Solar Postponed Solar 13.8 mi 5.4