Show on map
Cerro Gordo Wind Farm — Power plant · Wind · Cerro Gordo Wind Farm
  • Wind & solar
  • Operating
  • 10 · 100 · 1,000 MW

Cerro Gordo Wind Farm

Power plant · Wind

Key facts

Power plant · Windran 46% of 2025 Operating
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
2020
Net generation, 2025
167,792 MWh
Grid
69 kV to ITC Midwest LLC (MISO)
Location
Cerro Gordo County, Iowa
Operated by
Cerro Gordo Wind FarmSourceEIA-860M Preliminary Monthly Electric Generator Inventory

Output

Net generation MWh by year, 2020 to 2026

Operations detail

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Wind source: “Onshore Wind Turbine”
Age
6 years since 2020
All 5 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Grid
Nerc region
MRO
Report year
2025
Grid voltage kv
69
Transmission owner
ITC Midwest LLC
Balancing authority code
MISO
Balancing authority name
Midcontinent Independent Transmission System Operator, Inc..
Fuel burned (MMBtu), 2025572,508
Capacity factor, 20250.456
Net generation (MWh), 2025167,792
Balancing authority codeMISO

Wind turbines

Turbines
16
Turbine capacity (MW)
36.8
Turbine models
16 GE Wind GE2.3-116
Hub height (m)
80
Rotor diameter (m)
116
Year online
2020

Source U.S. Wind Turbine Database

Source

  • U.S. Wind Turbine DatabaseOpen license · retrieved Oct 25, 2026Map services and data are available from U.S. Wind Turbine Database, provided by the U.S. Geological Survey, American Clean Power Association, and Lawrence Berkeley National Laboratory via https://energy.usgs.gov/uswtdb

Attribution

Timeline

  • In service · EIA-860M

Sources

4 sources

Sources EIA-860M · U.S. Wind Turbine Database · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory

Sources

Every source and license · Attribution

View at source