Show on map
Chamon — Power plant · Gas, combustion turbine · PEAKER POWER LLC
  • Combustion
  • Operating
  • 10 · 100 · 1,000 MW

Power plant · Gas, combustion turbine

Key facts

Power plant · Gas, combustion turbineran 5% of 2025 Operating
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
2017
Net generation, 2025
51,297 MWh
Grid
138 kV to CenterPoint Energy (ERCO)
Location
Harris County, Texas
Operated by
Peaker Power LLC

Operations

Net generation, 2025
51,297MWh
Fuel burned, 2025
674,690MMBtu
Capacity factor, 2025
4.8%
Heat rate, 2025
13,153Btu/kWh
Capacity factor % of full output, by year
Heat rate Btu per kWh, by year
Net generation, fuel burned, capacity factor and heat rate by year, newest first, as EIA's bulk electricity file states them.
YearNet generation (MWh)Fuel burned (MMBtu)Capacity factorHeat rate (Btu/kWh)
202551,297674,6904.8%13,153
2024114,9121,284,00310.8%11,174
2023116,3161,231,62211.0%10,589
2022138,9231,576,28813.1%11,346
202165,666702,0836.2%10,692
202036,676391,4653.5%10,674
201961,604646,1635.8%10,489
201845,857497,5834.3%10,851
2017 (3 of 12 months)5,64059,166—10,490
How these are worked out

Net generation and fuel burned are the monthly figures EIA publishes in its bulk electricity file, from the plant's Form 923 reports; a year is the sum of its months. Capacity factor is a full year's net generation over today's nameplate capacity times the hours in that year (8,784 in a leap year), so a plant uprated or partly retired since reads against its current size; heat rate is fuel burned over net generation, for plants that burn fuel. A year with fewer than twelve months stated has no capacity factor, and a value outside the plausible range is left blank rather than shown. By month, the charts apply the same rules to each month's own hours and fuel.

Sources

3 sources

Sources EIA-860M · GEM · EIA

Sources

Every source and license · Attribution

View at source