Chanarambie Power Partners, LLC

Power plant · Wind

Key facts

Power plant · Windran 14% of 2022 Retired
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
2003
Net generation, 2022
102,661 MWh
Grid
34 kV to Northern States Power Co - Minnesota (MISO)
Location
Murray County, Minnesota
Operated by
ALLETE Clean EnergySourceEIA-860M Preliminary Monthly Electric Generator Inventory

Output

Net generation MWh by year, 2003 to 2022

Operations detail

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Wind source: “Onshore Wind Turbine”
Age
23 years since 2003
All 2 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Gem
Unit ids
G100000909292
Location id
L100000906900
Eia plant ids
56142
Balancing authority codeMISO

Retirement

EIA-860M September 2026StatusEvery generator EIA lists at this plant has retired. As of EIA-860M for September 2026.
Retired
December 2022
Capacity retired
85.5 MW
Generators retired
1
Generators that retired or are scheduled to retire
GeneratorTechnologyNameplateStateDate
WND1Onshore Wind Turbine85.5 MWRetiredDecember 2022

Grid

EIA-860 2025Grid fieldsAs the plant reported them to EIA-860 for 2025 (Schedule 2).
Grid voltage at the plant
34 kV
Transmission or distribution system owner
Northern States Power Co - Minnesota
Balancing authority
Midcontinent Independent Transmission System Operator, Inc..
NERC region
MRO
Can the connection be reused?

A plant that retires usually leaves its substation, transmission connection and interconnection agreement behind, and those may be reusable by a new project at the same site. FERC Order No. 845 lets an interconnection customer use surplus interconnection service at an existing site, and some transmission providers' tariffs let a replacement resource take over a retiring unit's interconnection service, usually within a set time after the retirement. Whether any such right still exists here, who holds it and on what terms depends on the owner, the transmission provider and timing; this page does not establish any of that.

Timeline

  • Stated Unit WND1 scheduled to retire, 85.5 MW · EIA-860M
  • In service · EIA-860M

Sources

4 sources

Sources EIA-860M · GEM · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026
  • GEMOpen license, with credit · retrieved Oct 26, 2026Global Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.
  • EIAOpen license · retrieved Nov 1, 2026Source: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)
  • EIA-860M Preliminary Monthly Electric Generator Inventory

Every source and license · Attribution