Channelview Cogen - Greens Bayou 345 kV
- Combustion
- Wind & solar
- Storage
- Loads
- In development
- Under construction
- Stage not stated
- Size not stated
- Other infrastructure
- 10 · 100 · 1,000 MW
Map
- Combustion
- Wind & solar
- Storage
- Loads
- In development
- Under construction
- Stage not stated
- Size not stated
- Other infrastructure
Channelview Cogen - Greens Bayou 345 kV: route and 11 exact-grade projects within 15 mi. Basemap: Protomaps, © OpenStreetMap contributors, ODbL.
Channelview Cogen - Greens Bayou 345 kV
Transmission line
- Mapped route length
- Mapped route length: sourceLBNL · Open license, with creditmiles
- Voltage
- 345 kV
- States crossed
- US-TX
- Owner (as stated)
- Centerpoint Energy Houston Electric
Details
Who’s behind it
- Owner
- Centerpoint Energy Houston Electric
Interested in this project?
Set an alert
About these actionsOur team gets you what you need. Beta: private project space · data room · readiness check Want this as data? Free via the API and alerts.
- Mapped route length (miles)
- 7
- Substations at the ends (as the source names them)
- Channelview Cogen to Greens Bayou
All 3 attributes from LBNL — A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024 (OEDI submission 8742)
| Attribute | Value |
|---|---|
| Owner, as the source states it | centerpoint energy houston electric |
| HIFLD line ID | 303956 |
| Voltage class | 345 kV |
Sources
1 sourceSources LBNL
Sources
- LBNLYin, Nait Belaid & Heleno (2026), Lawrence Berkeley National Laboratory, OEDI, CC BY 4.0: A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024. Modified by Inframation: HIFLD-side fields only, names re-cased, coordinates rounded.
Around this line
Nearby
within 15 mi| Project | Kind | Away | MW |
|---|---|---|---|
| Greens Bayou 6 Under construction | Gas, combustion turbine | 0.2 mi | 445 |
| TX Houston 7080 Express Lane Postponed | Storage | 1.7 mi | 1.5 |
| CPV Pondera King Energy Center Postponed | Gas, combined cycle | 6.2 mi | 900 |
| Texas Petrochemicals Postponed | Gas, combined cycle | 8.5 mi | 560 |
| TX LaPort 10060 Porter Road Solar Postponed | Solar | 9.0 mi | 1.6 |
| GCCISD NEW TECHNOLOGY DATA CENTER Unknown | Large load | 10.0 mi | |
| Noor Solar Filed | Solar | 10.6 mi | 188.2 |
| Coneflower Storage Project LLC Contracted | Storage | 11.9 mi | 170.8 |
| NET Power La Porte Station Studied | Gas, combustion turbine | 12.6 mi | 25.5 |
| BESS TX Camarine - BSHOU001 Under construction | Storage | 13.1 mi | 9.9 |
| Cedar Bayou 5 Under construction | Gas, combustion turbine | 13.2 mi | 697 |
Sources ERCOT · EIA-860M · EPA ICIS-NPDES