Show on map
Cherry Hill — Power plant · Solar · NFI Solar LLCDeptford Solar One — Postponed · Solar · NJ · 3 MW · 8.2 mi awayPettinos Solar — Postponed · Solar · NJ · 1.2 MW · 8.9 mi awayEQUINIX — Large load · PA · 10.0 mi awayCROSS CONNECT SOLUTIONS — Built · Large load · PA · 10.0 mi away365 DATA CENTERS — Built · Large load · PA · 10.1 mi awayH5 DATA CENTERS — Built · Large load · PA · 10.1 mi away
  • Wind & solar
  • Loads
  • Operating
  • Stage not stated
  • Size not stated
  • 10 · 100 · 1,000 MW

Cherry Hill

Power plant · Solar

Key facts

Power plant · Solarran 13% of 2025 Operating
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
2010
Net generation, 2025
1,289 MWh
Grid
13 kV to Public Service Elec & Gas Co (PJM)
Location
Camden County, New Jersey
Operated by
NFI Solar LLCSourceEIA-860M Preliminary Monthly Electric Generator Inventory

Output

Net generation MWh by year, 2011 to 2025

Operations detail

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Solar source: “Solar Photovoltaic”
Age
16 years since 2010
All 6 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Gem
Unit ids
G100000815074
Location id
L100000812447
Eia plant ids
57734
Grid
Nerc region
RFC
Report year
2025
Grid voltage kv
13.20
Transmission owner
Public Service Elec & Gas Co
Balancing authority code
PJM
Balancing authority name
PJM Interconnection, LLC
Fuel burned (MMBtu), 20254,399
Capacity factor, 20250.134
Net generation (MWh), 20251,289.0
Balancing authority codePJM

Solar array

Array area (acres)
2.5
AC capacity (MW)
1.1
DC capacity (MW)
1.3
Mounting
Fixed tilt
Site type
Greenfield
Began operating
2010

Source USPVDB

Source

  • USPVDBOpen license · retrieved Oct 25, 2026Map services and data are available from Large-Scale Solar Photovoltaic Database, provided by the U.S. Geological Survey and Lawrence Berkeley National Laboratory via https://energy.usgs.gov/uspvdb

Attribution

Timeline

  • In service · EIA-860M

Sources

5 sources

Sources EIA-860M · GEM · USPVDB · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026
  • GEMOpen license, with credit · retrieved Oct 26, 2026Global Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.
  • USPVDBOpen license · retrieved Oct 25, 2026Map services and data are available from Large-Scale Solar Photovoltaic Database, provided by the U.S. Geological Survey and Lawrence Berkeley National Laboratory via https://energy.usgs.gov/uspvdb
  • EIAOpen license · retrieved Nov 1, 2026Source: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)
  • EIA-860M Preliminary Monthly Electric Generator Inventory

Every source and license · Attribution

View at source

Around this plant

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
Deptford Solar One Postponed Solar 8.2 mi 3
Pettinos Solar Postponed Solar 8.9 mi 1.2
EQUINIX Unknown Large load 10.0 mi
CROSS CONNECT SOLUTIONS Built Large load 10.0 mi
365 DATA CENTERS Built Large load 10.1 mi
H5 DATA CENTERS Built Large load 10.1 mi

Sources EIA-860M · EPA ICIS-Air

Sources

Attribution