Chesterfield - Tyler 230 kV: route and 18 exact-grade projects within 15 mi. Basemap: Protomaps, © OpenStreetMap contributors, ODbL.
Chesterfield - Tyler 230 kV
Transmission line
- Mapped route length
- Mapped route length: sourceLBNL · Open license, with creditmiles
- Voltage
- 230 kV
- States crossed
- US-VA
- Owner (as stated)
- Virginia Electric Power
Details
Who’s behind it
- Owner
- Virginia Electric Power
Interested in this project?
Set an alert Book a call Join the beta
Our team gets you what you need.
Beta: private project space · data room · readiness check
- Mapped route length (miles)
- 2
- Substations at the ends (as the source names them)
- Chesterfield to Tyler
All 3 attributes from LBNL — A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024 (OEDI submission 8742)
| Attribute | Value |
|---|---|
| Owner, as the source states it | virginia electric power |
| HIFLD line ID | 117121 |
| Voltage class | 220-287 kV |
Sources
1 sourceSources LBNL
Sources
- LBNLYin, Nait Belaid & Heleno (2026), Lawrence Berkeley National Laboratory, OEDI, CC BY 4.0: A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024. Modified by Inframation: HIFLD-side fields only, names re-cased, coordinates rounded.
Around this line
Nearby
within 15 mi| Project | Kind | Away | MW |
|---|---|---|---|
| Chesterfield Filed | Gas, combustion turbine | 0.2 mi | 1,000 |
| 11751 MEADOWVILLE OWNER LLC C/O GFH CAPITAL LTD Built | Large load | 3.1 mi | |
| CHIRISA RICHMOND LLC Built | Large load | 3.4 mi | |
| Chester Solar Technology Park, LLC Filed | Solar | 4.5 mi | 160 |
| Peanut LLC Filed | Large load | 4.9 mi | |
| Petersburg - VA 0224 (Murphy) Under construction | Solar | 7.7 mi | 2.6 |
| Bridleton Solar Filed | Solar | 8.4 mi | 20 |
| IRON MOUNTAIN DATA CENTER Under construction | Large load | 10.4 mi | |
| PROJECT TROPICAL PHASE 2 - DATA CENTER AND SUBSTAT Under construction | Large load | 10.5 mi | |
| QTS RICHMOND DATA CENTER Built | Large load | 11.0 mi | |
| SCOUT DEVELOPMENT LLC Built | Large load | 11.0 mi | |
| Bank of America - Sandston Built | Large load | 11.2 mi | |
| QTS RIC5 Data Center Filed | Large load | 11.2 mi | |
| QTS Richmond V LLC Filed | Large load | 11.3 mi | |
| Iron Mountain Information Management LLC Filed | Large load | 11.6 mi | |
| C4GT Postponed | Gas, combined cycle | 12.8 mi | 1,060 |
| Chickahominy Power LLC Postponed | Gas, combined cycle | 13.3 mi | 1,716.3 |
| PointOne Richmond LLC Filed | Large load | 13.3 mi |
Sources EIA-860M · Virginia DEQ · EPA ICIS-Air · EPA ICIS-NPDES · FAA OE/AAA
Sources
- EIA-860M
- Virginia DEQSource: Virginia Department of Environmental Quality
- EPA ICIS-Air
- EPA ICIS-NPDES
- FAA OE/AAA