Chesterfield: location and 18 exact-grade projects within 15 mi. Basemap: Protomaps, © OpenStreetMap contributors, ODbL.
Chesterfield
Power plant · Gas, combined cycle
Key facts
Power plant · Gas, combined cycleran 53% of 2025 Operating- Capacity
- Capacity: sourceEIA-860M · Open licenseMW
- Commissioned
- 1990
- Net generation, 2025
- 2,070,103 MWh
- Grid
- 230 kV to Virginia Electric & Power Co (PJM)
- Location
- Chesterfield County, Virginia
- Operated by
- Virginia Electric & Power Co
Output
- Gas
- Coal
- Oil
Details
Who’s behind it
- Owner
- Dominion Energy Inc.
Interested in this project?
Set an alert Book a call Join the beta
Our team gets you what you need.
Beta: private project space · data room · readiness check
- Technology
- Gas, combined cycle source: “Natural Gas Fired Combined Cycle”
- Age
- 36 years since 1990
- Unused energy
- 1,842 GWh 2025Unused energyA lead, not a guarantee: MW × hours × (1 − capacity factor) for the latest year (EIA-923), gas, coal and oil plants only. Air-permit run-hour caps, heat rate (cost to run) and capacity-market or reliability obligations can rule it out.
- Heat rate
- 7,748 Btu/kWh 2025
All 7 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
| Attribute | Value |
|---|---|
| Gem |
|
| EPA greenhouse gas reporting (GHGRP) |
|
| Fuel burned (MMBtu), 2025 | 16,038,705 |
| Capacity factor, 2025 | 0.529 |
| Heat rate (Btu/kWh), 2025 | 7,747.8 |
| Net generation (MWh), 2025 | 2,070,103.0 |
| Balancing authority code | PJM |
Retirement
EIA-860M September 2026StatusSome generators have retired; the rest of the plant is still in service. As of EIA-860M for September 2026.- Capacity retired
- 1,352.9 MW
- Generators retired
- 4
- Capacity still in service
- 446.6 MW
| Generator | Technology | Nameplate | State | Date |
|---|---|---|---|---|
| 3 | Conventional Steam Coal | 112.5 MW | Retired | March 2019 |
| 4 | Conventional Steam Coal | 187.5 MW | Retired | March 2019 |
| 5 | Conventional Steam Coal | 359 MW | Retired | May 2023 |
| 6 | Conventional Steam Coal | 693.9 MW | Retired | May 2023 |
Grid
EIA-860 2025Grid fieldsAs the plant reported them to EIA-860 for 2025 (Schedule 2).- Grid voltage at the plant
- 230 kV
- Transmission or distribution system owner
- Virginia Electric & Power Co
- Balancing authority
- PJM Interconnection, LLC
- NERC region
- SERC
Transmission lines within 15 mi (10)
- Chesterfield - Chesterfield 230 kV
- Chesterfield - Chesterfield 230 kV
- Chesterfield - Chesterfield 230 kV
- Chesterfield - Chesterfield 230 kV
- Chesterfield 115 kV line
- Reymet - Chesterfield 115 kV
- Chesterfield 115 kV line
- Chesterfield 115 kV line
- Chesterfield 115 kV line
- Chesterfield - Chesterfield 230 kV
Can the connection be reused?
A plant that retires usually leaves its substation, transmission connection and interconnection agreement behind, and those may be reusable by a new project at the same site. FERC Order No. 845 lets an interconnection customer use surplus interconnection service at an existing site, and some transmission providers' tariffs let a replacement resource take over a retiring unit's interconnection service, usually within a set time after the retirement. Whether any such right still exists here, who holds it and on what terms depends on the owner, the transmission provider and timing; this page does not establish any of that.
Ownership
2 companies2| Company | Role | Share | As of | Source |
|---|---|---|---|---|
| Virginia Electric & Power Co | Operator | EIA-860M | ||
| Dominion Energy Inc. | Owner | 100.0% | Dec 31, 2023 | EPA GHGRP |
Timeline
- Stated Units 5, 6 scheduled to retire, 1,052.9 MW · EIA-860M
- Stated Units 3, 4 scheduled to retire, 300 MW · EIA-860M
- In service · EIA-860M
Sources
6 sourcesSources EIA-860M · GEM · LBNL · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory · EPA Greenhouse Gas Reporting Program — facility register with parent-company shares (Envirofacts pub_dim_facility; FLIGHT)
Sources
- EIA-860M
- GEMGlobal Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.
- LBNLYin, Nait Belaid & Heleno (2026), Lawrence Berkeley National Laboratory, OEDI, CC BY 4.0: A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024. Modified by Inframation: HIFLD-side fields only, names re-cased, coordinates rounded.
- EIASource: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)
- EIA-860M Preliminary Monthly Electric Generator Inventory
- EPA Greenhouse Gas Reporting Program — facility register with parent-company shares (Envirofacts pub_dim_facility; FLIGHT)
Around this plant
Nearby
within 15 mi| Project | Kind | Away | MW |
|---|---|---|---|
| Chesterfield Filed | Gas, combustion turbine | 0.0 mi | 1,000 |
| 11751 MEADOWVILLE OWNER LLC C/O GFH CAPITAL LTD Built | Large load | 3.1 mi | |
| CHIRISA RICHMOND LLC Built | Large load | 3.5 mi | |
| Peanut LLC Filed | Large load | 5.0 mi | |
| Chester Solar Technology Park, LLC Filed | Solar | 6.4 mi | 160 |
| Bridleton Solar Filed | Solar | 8.2 mi | 20 |
| Petersburg - VA 0224 (Murphy) Under construction | Solar | 10.0 mi | 2.6 |
| IRON MOUNTAIN DATA CENTER Under construction | Large load | 10.2 mi | |
| PROJECT TROPICAL PHASE 2 - DATA CENTER AND SUBSTAT Under construction | Large load | 10.3 mi | |
| QTS RICHMOND DATA CENTER Built | Large load | 10.8 mi | |
| SCOUT DEVELOPMENT LLC Built | Large load | 10.9 mi | |
| Bank of America - Sandston Built | Large load | 11.1 mi | |
| QTS RIC5 Data Center Filed | Large load | 11.1 mi | |
| QTS Richmond V LLC Filed | Large load | 11.2 mi | |
| Iron Mountain Information Management LLC Filed | Large load | 11.5 mi | |
| C4GT Postponed | Gas, combined cycle | 12.7 mi | 1,060 |
| Chickahominy Power LLC Postponed | Gas, combined cycle | 13.2 mi | 1,716.3 |
| PointOne Richmond LLC Filed | Large load | 13.2 mi |
Sources EIA-860M · Virginia DEQ · EPA ICIS-Air · EPA ICIS-NPDES · FAA OE/AAA
Sources
- EIA-860M
- Virginia DEQSource: Virginia Department of Environmental Quality
- EPA ICIS-Air
- EPA ICIS-NPDES
- FAA OE/AAA