Show on map
Chestnut — Power plant · Solar · Chestnut Westside LLCGrape — Solar · CA · 246.4 MW · 1.6 km awayCherry — Solar + storage · CA · 359.7 MW · 4.5 km awaySand Luis West — Solar + storage · CA · 156.3 MW · 13.4 km awayKey Energy Storage — Storage · CA · 300.1 MW · 20.5 km away
  • Wind & solar
  • Storage
  • In development
  • Under construction
  • Operating
  • 10 · 100 · 1,000 MW

Power plant · Solar

Key facts

Power plant · Solarran 15% of 2025 Operating
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
2023
Net generation, 2025
377,844 MWh
Grid
230 kV to Pacific Gas & Electric Co. (CISO)
Location
Kings County, California
Operated by
Chestnut Westside LLCSourceEIA-860M Preliminary Monthly Electric Generator Inventory

Output

Net generation MWh by year, 2024 to 2026

Operations detail

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Solar source: “Solar Photovoltaic”
Age
3 years since 2023
All 5 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Grid
Nerc region
WECC
Report year
2025
Grid voltage kv
230
Transmission owner
Pacific Gas & Electric Co.
Balancing authority code
CISO
Balancing authority name
California Independent System Operator
Fuel burned (MMBtu), 20251,375,052
Capacity factor, 20250.151
Net generation (MWh), 2025377,844
Balancing authority codeCISO

Solar arrays

Array area (acres)
734.7
AC capacity (MW)
150.6
DC capacity (MW)
210
Site type
Greenfield
Began operating
2023

Source USPVDB

Source

  • U.S. Large-Scale Solar Photovoltaic DatabaseOpen license · retrieved 25 Oct 2026Map services and data are available from Large-Scale Solar Photovoltaic Database, provided by the U.S. Geological Survey and Lawrence Berkeley National Laboratory via https://energy.usgs.gov/uspvdb

Attribution

Timeline

  • In service · EIA-860M

Sources

4 sources

Sources EIA-860M · USPVDB · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory

Sources

Every source and license · Attribution

View at source

Around this plant

Nearby

within 25 km
Projects within 25 km, nearest first.
ProjectKindAwayMW
Grape Under construction Solar 1.6 km 246.4
Cherry Permitted Solar + storage 4.5 km 359.7
Sand Luis West Permitted Solar + storage 13.4 km 156.3
Key Energy Storage Under construction Storage 20.5 km 300.1

Sources EIA-860M · CAISO

Sources

Attribution