Show on map
- Wind & solar
- Storage
- Bioenergy
- In development
- Under construction
- Other infrastructure
- 10 · 100 · 1,000 MW
Map
- Wind & solar
- Storage
- Bioenergy
- In development
- Under construction
- Other infrastructure
CHEVRON USA INC TRACY, TRACY TERMINAL: location and 11 exact-grade projects within 15 mi. Basemap: Protomaps, © OpenStreetMap contributors, ODbL.
Chevron USA Inc Tracy, Tracy Terminal
Petroleum product terminal
As filed: CHEVRON USA INC TRACY, TRACY TERMINAL
Key facts
Petroleum product terminal Operating- Location
- California
Details
Who’s behind it
- Owner
- Chevron USA Inc TracySourceEIA US Energy Atlas — Petroleum Product Terminals (points; owner company, EIA-815)
Interested in this project?
Set an alert Book a call Join the beta
Our team gets you what you need.
Beta: private project space · data room · readiness check
Capacity not stated
All 5 attributes from EIA US Energy Atlas — Petroleum Product Terminals (points; owner company, EIA-815)
| Attribute | Value |
|---|---|
| Padd | 5 |
| Site | TRACY TERMINAL |
| Survey | EIA-815 |
| Owner, as the source states it | CHEVRON USA INC TRACY |
| Source release | 202109 |
Sources
2 sourcesSources EIA Energy Atlas · EIA US Energy Atlas — Petroleum Product Terminals (points; owner company, EIA-815)
Sources
- EIA Energy AtlasSource: U.S. Energy Information Administration, U.S. Energy Atlas, Petroleum Product Terminals (as of September 2021)
- EIA US Energy Atlas — Petroleum Product Terminals (points; owner company, EIA-815)
Around this asset
Nearby
within 15 mi| Project | Kind | Away | MW |
|---|---|---|---|
| Tracy Renewable Power Plant Under construction | Biomass | 4.4 mi | 5 |
| Zeus BESS Contracted | Storage | 8.1 mi | 200 |
| Tracy BESS Under construction | Storage | 8.2 mi | 40 |
| Stockton 9 - slcva209 Under construction | Solar | 10.7 mi | 1 |
| Noosa Energy Storage LLC Under construction | Storage | 11.0 mi | 99 |
| TESLA Power Project Postponed | Gas, combined cycle | 12.0 mi | 1,322 |
| Sand Hill B Filed | Wind | 13.5 mi | 17 |
| Sand Hill C Contracted | Wind | 13.6 mi | 80.8 |
| Mulqueeney Wind Energy Under construction | Wind | 13.6 mi | 80 |
| Sand Hill A Filed | Wind | 14.2 mi | 13.5 |
| Stockton 1 - slcva801 Under construction | Solar | 14.6 mi | 1 |