Chicago Baking — Power plant · Gas, combustion turbine · Lewis BakeriesITT Cogen Facility — Under construction · Gas, reciprocating engine · IL · 8.2 MW · 4.8 km awayHYDRAVAULT LLC — Built · Large load · IL · 6.1 km awayQUALITY TECHNOLOGY SERVICES LLC — Built · Large load · IL · 6.7 km awayEQUINIX LLC — Built · Large load · IL · 6.9 km awayTIERPOINT ILLINOIS LLC — Built · Large load · IL · 9.0 km awayDIGITAL REALTY TRUST LP — Built · Large load · IL · 9.2 km awayLEGACY GI 400 LASALLE LLC — Large load · IL · 9.5 km awayCicero 3-SLCHI603 — Under construction · Solar · IL · 1.9 MW · 13.7 km awayMcCook 2-SLCHI102 — Under construction · Solar · IL · 2 MW · 16.2 km awayRobbins Community Power LLC — Postponed · Biomass · IL · 55 MW · 17.0 km awayIL - SMHEC - Moraine Valley — Postponed · Solar · IL · 1.3 MW · 20.5 km awayW 167th St — Under construction · Solar · IL · 1.5 MW · 22.4 km awayDIGITAL GRAND AVENUE 3 LLC — Built · Large load · IL · 24.6 km awayDLR 9311 (Franklin Park data centre) — Filed · Large load · IL · 24.6 km awayFRANKLIN PARK (CHI22) DATA CENTER — Built · Large load · IL · 24.8 km awayW Belmont Ave — Under construction · Solar · IL · 1.4 MW · 24.9 km away
  • Combustion
  • Wind & solar
  • Loads
  • In development
  • Under construction
  • Operating
  • Retired
  • Stage not stated
  • Size not stated
  • 10 · 100 · 1,000 MW

Chicago Baking

Power plant · Gas, combustion turbine

Key facts

Power plant · Gas, combustion turbine Retired
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
1988
Net generation, 2004
0 MWh
Location
Cook County, Illinois
Operated by
Lewis BakeriesSourceEIA-860M Preliminary Monthly Electric Generator Inventory

Output

Net generation MWh by year, 2001 to 2004
Fuel burned MMBtu by year, 2001 to 2004
  • Gas

Operations detail

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Gas, combustion turbine source: “Natural Gas Fired Combustion Turbine”
Age
38 years since 1988

Retirement

EIA-860M September 2026StatusEvery generator EIA lists at this plant has retired. As of EIA-860M for September 2026.
Retired
October 2004
Capacity retired
1 MW
Generators retired
1
Generators that retired or are scheduled to retire
GeneratorTechnologyNameplateStateDate
CDKNatural Gas Fired Combustion Turbine1 MWRetiredOctober 2004

Grid

Not in EIA-860Grid fieldsEIA-860 states no grid voltage or transmission owner for this plant: its annual file lists plants with a generator in the report year, so a plant that retired earlier is not in it.
Transmission lines within 25 km (10)
Can the connection be reused?

A plant that retires usually leaves its substation, transmission connection and interconnection agreement behind, and those may be reusable by a new project at the same site. FERC Order No. 845 lets an interconnection customer use surplus interconnection service at an existing site, and some transmission providers' tariffs let a replacement resource take over a retiring unit's interconnection service, usually within a set time after the retirement. Whether any such right still exists here, who holds it and on what terms depends on the owner, the transmission provider and timing; this page does not establish any of that.

Timeline

  • Stated Unit CDK scheduled to retire, 1 MW · EIA-860M
  • In service · EIA-860M

Sources

4 sources

Sources EIA-860M · LBNL · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026
  • LBNLOpen license, with credit · retrieved Nov 9, 2026Yin, Nait Belaid & Heleno (2026), Lawrence Berkeley National Laboratory, OEDI, CC BY 4.0: A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024. Modified by Inframation: HIFLD-side fields only, names re-cased, coordinates rounded.
  • EIAOpen license · retrieved Nov 1, 2026Source: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)
  • EIA-860M Preliminary Monthly Electric Generator Inventory

Every source and license · Attribution

View at source

Around this plant

Nearby

within 25 km
Projects within 25 km, nearest first.
ProjectKindAwayMW
ITT Cogen Facility Under construction Gas, reciprocating engine 4.8 km 8.2
HYDRAVAULT LLC Built Large load 6.1 km
QUALITY TECHNOLOGY SERVICES LLC Built Large load 6.7 km
EQUINIX LLC Built Large load 6.9 km
TIERPOINT ILLINOIS LLC Built Large load 9.0 km
DIGITAL REALTY TRUST LP Built Large load 9.2 km
LEGACY GI 400 LASALLE LLC Unknown Large load 9.5 km
Cicero 3-SLCHI603 Under construction Solar 13.7 km 1.9
McCook 2-SLCHI102 Under construction Solar 16.2 km 2
Robbins Community Power LLC Postponed Biomass 17.0 km 55
IL - SMHEC - Moraine Valley Postponed Solar 20.5 km 1.3
W 167th St Under construction Solar 22.4 km 1.5
DIGITAL GRAND AVENUE 3 LLC Built Large load 24.6 km
DLR 9311 (Franklin Park data centre) Filed Large load 24.6 km
FRANKLIN PARK (CHI22) DATA CENTER Built Large load 24.8 km
W Belmont Ave Under construction Solar 24.9 km 1.4

Sources EIA-860M · EPA ICIS-Air · FAA OE/AAA