- Clean firm
- Operating
- 10 · 100 · 1,000 MW
Map
- Clean firm
- Operating
Chippewa Falls: location and 2 exact-grade projects within 15 mi. Basemap: Protomaps, © OpenStreetMap contributors, ODbL.
Chippewa Falls
Power plant · Hydro
Key facts
Power plant · Hydroran 30% of 2025 Retiring- Capacity
- Capacity: sourceEIA-860M · Open licenseMW
- Commissioned
- 1928
- Net generation, 2025
- 56,088 MWh
- Grid
- 69 kV to Northern States Power Co (MISO)
- Location
- Chippewa County, Wisconsin
- Operated by
- Northern States Power Co - MinnesotaSourceEIA-860M Preliminary Monthly Electric Generator Inventory
Output
Details
Who’s behind it
No companies named in filings yet.
Interested in this project?
Set an alert Book a call Join the beta
Our team gets you what you need.
Beta: private project space · data room · readiness check
- Technology
- Hydro source: “Conventional Hydroelectric”
- Age
- 98 years since 1928
All 4 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
| Attribute | Value |
|---|---|
| Fuel burned (MMBtu), 2025 | 191,373 |
| Capacity factor, 2025 | 0.296 |
| Net generation (MWh), 2025 | 56,088 |
| Balancing authority code | MISO |
Retirement
EIA-860M September 2026StatusAt least half of the plant's in-service nameplate capacity is scheduled to retire, on dates its owner has reported to EIA. As of EIA-860M for September 2026.- Next scheduled retirement
- December 2033
- Capacity scheduled to retire
- 21.6 MW
- Generators scheduled to retire
- 6
- Share of in-service capacity scheduled
- 100%
- Capacity still in service
- 21.6 MW
| Generator | Technology | Nameplate | State | Date |
|---|---|---|---|---|
| 1 | Conventional Hydroelectric | 3.6 MW | Scheduled to retire | December 2033 |
| 2 | Conventional Hydroelectric | 3.6 MW | Scheduled to retire | December 2033 |
| 3 | Conventional Hydroelectric | 3.6 MW | Scheduled to retire | December 2033 |
| 4 | Conventional Hydroelectric | 3.6 MW | Scheduled to retire | December 2033 |
| 5 | Conventional Hydroelectric | 3.6 MW | Scheduled to retire | December 2033 |
| 6 | Conventional Hydroelectric | 3.6 MW | Scheduled to retire | December 2033 |
Grid
EIA-860 2025Grid fieldsAs the plant reported them to EIA-860 for 2025 (Schedule 2).- Grid voltage at the plant
- 69 kV
- Transmission or distribution system owner
- Northern States Power Co
- Balancing authority
- Midcontinent Independent Transmission System Operator, Inc..
- NERC region
- MRO
Transmission lines within 15 mi (9)
Can the connection be reused?
A plant that retires usually leaves its substation, transmission connection and interconnection agreement behind, and those may be reusable by a new project at the same site. FERC Order No. 845 lets an interconnection customer use surplus interconnection service at an existing site, and some transmission providers' tariffs let a replacement resource take over a retiring unit's interconnection service, usually within a set time after the retirement. Whether any such right still exists here, who holds it and on what terms depends on the owner, the transmission provider and timing; this page does not establish any of that.
Timeline
- Stated Units 1, 2, 3, 4, 5, 6 scheduled to retire, 21.6 MW · EIA-860M
- In service · EIA-860M
Sources
4 sourcesSources EIA-860M · LBNL · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory
Sources
- EIA-860M
- LBNLYin, Nait Belaid & Heleno (2026), Lawrence Berkeley National Laboratory, OEDI, CC BY 4.0: A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024. Modified by Inframation: HIFLD-side fields only, names re-cased, coordinates rounded.
- EIASource: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)
- EIA-860M Preliminary Monthly Electric Generator Inventory
Around this plant
Nearby
within 15 mi| Project | Kind | Away | MW |
|---|---|---|---|
| Seven Mile Creek LFG Postponed | Biomass | 7.0 mi | 0.8 |
| Elk Mound Postponed | Gas, combustion turbine | 9.0 mi | 71 |
Sources EIA-860M