Church Street Plant — Power plant · Oil · City of Manassas - (VA)Amazon Data Services Inc IAD-205/307/317/612/612x — Filed · Large load · VA · 1.6 mi awayDominion/Lo Mar — Postponed · Oil · VA · 5.4 MW · 1.9 mi awayQTS INVESTMENT PROPERTIES MANASSAS LLC — Built · Large load · VA · 2.2 mi awayAMAZON DATA SERVICES, INC. IAD-100 IAD-101 IAD-102 IAD-103 — Built · Large load · VA · 2.3 mi awayDIGITAL THIRD SECOND MANASSAS, LLC & DIGITAL CARVER BRICKYARD, LLC. — Built · Large load · VA · 2.4 mi awayNVA05C DATA CENTER — Under construction · Large load · VA · 2.6 mi awayDLR Brickyard - Building B (Manassas data centre) — Filed · Large load · VA · 2.7 mi awayMANASSAS CORPORATE CENTER DATA CENTER BUILDING 6 M — Built · Large load · VA · 2.8 mi awayQTS MAN1 DC6 - A&A Temp Crane - SW Corner — Filed · Large load · VA · 2.9 mi awaySI NVA05D LLC — Filed · Large load · VA · 2.9 mi awayCashvad Ventures LLC — Filed · Large load · VA · 2.9 mi awaySI NVA05A, LLC AND SI NVA05D, LLC — Built · Large load · VA · 2.9 mi awayMCC7 (Manassas data centre) — Filed · Large load · VA · 2.9 mi awayCLOUD HQ — Built · Large load · VA · 2.9 mi awayCloudHQ MDC1 — Filed · Large load · VA · 2.9 mi awayAMAZON DATA SERVICES (IAD-130, IAD-131, IAD-313, AND DCA-072) — Built · Large load · VA · 3.0 mi awayMDC1 DATA CENTER — Large load · VA · 3.0 mi awayNVA05E Data Center — Filed · Large load · VA · 3.0 mi awayIAD 104- 9680 Innovation Dr. Manassas Va. — Built · Large load · VA · 3.1 mi awayAmazon Data Services Inc IAD-319 — Filed · Large load · VA · 3.1 mi awayIAD319 — Filed · Large load · VA · 3.1 mi awayAMAZON DATA SERVICES INC - IAD-104/105/106 — Built · Large load · VA · 3.2 mi awayComcast Cablevision of Virginia Incorporated — Built · Large load · VA · 3.3 mi awayAMAZON DATA SERVICES, INC. IAD-132 IAD-133 — Built · Large load · VA · 3.7 mi awayCORPORATE OFFICE PROPERTIES TRUST (COPT - DC6) — Built · Large load · VA · 3.8 mi awaySI NVA02D, LLC — Built · Large load · VA · 3.9 mi awayJK REDSTONE TECH PARK- SOUTH (Manassas data centre) — Filed · Large load · VA · 4.0 mi awayAmazon Data Services Inc IAD-45 — Filed · Large load · VA · 4.1 mi awayAMAZON DATA SERVICES, INC. IAD-75 IAD-85 IAD-95 IAD-96 — Built · Large load · VA · 4.3 mi awayEQUINIX, LLC - DC 14 — Built · Large load · VA · 4.4 mi awayAmazon Data Services Inc IAD-310/311/312 — Filed · Large load · VA · 4.4 mi awayIAD 210 LTM 1110 — Built · Large load · VA · 4.5 mi awayIron Mountain VA8 and VA9 — Filed · Large load · VA · 4.5 mi awayAMAZON DATA SERVICES INC IAD-210/211 — Built · Large load · VA · 4.5 mi awayOath, Inc. — Built · Large load · VA · 4.5 mi awayIRON MOUNTAIN INFORMATION MANAGEMENT LLC — Built · Large load · VA · 4.7 mi awayRailroad Energy Center, LLC — Under construction · Storage · VA · 20 MW · 4.7 mi awayBethlehem Energy Center, LLC - (VA) — Under construction · Storage · VA · 20 MW · 4.8 mi awayYOUTH FOR TOMORROW DATA CENTER - EARLY GRADING PLA — Large load · VA · 4.8 mi awayAMAZON DATA SERVICES, INC. IAD-7 IAD-11 IAD-24 — Built · Large load · VA · 4.9 mi awayMicrosoft - Manassas Data Center - MNZ01 — Filed · Large load · VA · 4.9 mi awayIAD 193 - A&A Temporary Crane — Filed · Large load · VA · 5.3 mi awayAMAZON DATA SERVICES, INC. IAD-14 IAD-52 IAD-59 — Built · Large load · VA · 5.3 mi awayAMAZON DATA SERVICES, INC. IAD-73 IAD-74 IAD-602 IAD-193 IAD-194 — Built · Large load · VA · 5.4 mi awayBCG Rose West (Wellington data centre) — Filed · Large load · VA · 5.7 mi awayMICROSOFT - GAINESVILLE DATA CENTER - MNZ03 — Built · Large load · VA · 5.9 mi awayProject Industry Building 1 (Gainesville data centre) — Filed · Large load · VA · 6.4 mi awayNOVA MANGO FARMS LLC — Built · Large load · VA · 6.9 mi awayIAD112 NW — Filed · Large load · VA · 6.9 mi awayAmazon Data Services, Inc. IAD-110, IAD-111, IAD-112, and IAD-113 — Filed · Large load · VA · 6.9 mi away
  • Combustion
  • Storage
  • Loads
  • In development
  • Under construction
  • Operating
  • Stage not stated
  • Size not stated
  • 10 · 100 · 1,000 MW

Church Street Plant

Power plant · Oil

Key facts

Power plant · Oilran 1% of 2025 Operating
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
1987
Net generation, 2025
192 MWh
Grid
13 kV to City of Manassas - (VA) (PJM)
Location
Prince William County, Virginia
Operated by
City of Manassas - (VA)SourceEIA-860M Preliminary Monthly Electric Generator Inventory

Output

Net generation MWh by year, 2001 to 2025
Fuel burned MMBtu by year, 2001 to 2025
  • Oil

Operations detail

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Oil source: “Petroleum Liquids”
Age
39 years since 1987
Unused energy
37 GWh 2025Unused energyA lead, not a guarantee: MW × hours × (1 − capacity factor) for the latest year (EIA-923), gas, coal and oil plants only. Air-permit run-hour caps, heat rate (cost to run) and capacity-market or reliability obligations can rule it out.
Heat rate
20,151 Btu/kWh 2025
All 5 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Fuel burned (MMBtu), 20253,869
Capacity factor, 20250.005
Heat rate (Btu/kWh), 202520,151
Net generation (MWh), 2025192
Balancing authority codePJM

Retirement

EIA-860M September 2026StatusSome generators have retired; the rest of the plant is still in service. As of EIA-860M for September 2026.
Capacity retired
3 MW
Generators retired
3
Capacity still in service
4.3 MW
Generators that retired or are scheduled to retire
GeneratorTechnologyNameplateStateDate
C1Petroleum Liquids1 MWRetiredOctober 2018
C2Petroleum Liquids1 MWRetiredOctober 2018
C4Petroleum Liquids1 MWRetiredOctober 2018

Grid

EIA-860 2025Grid fieldsAs the plant reported them to EIA-860 for 2025 (Schedule 2).
Grid voltage at the plant
13 kV
Transmission or distribution system owner
City of Manassas - (VA)
Balancing authority
PJM Interconnection, LLC
NERC region
SERC
Transmission lines within 15 mi (10)
Can the connection be reused?

A plant that retires usually leaves its substation, transmission connection and interconnection agreement behind, and those may be reusable by a new project at the same site. FERC Order No. 845 lets an interconnection customer use surplus interconnection service at an existing site, and some transmission providers' tariffs let a replacement resource take over a retiring unit's interconnection service, usually within a set time after the retirement. Whether any such right still exists here, who holds it and on what terms depends on the owner, the transmission provider and timing; this page does not establish any of that.

Timeline

  • Stated Units C1, C2, C4 scheduled to retire, 3 MW · EIA-860M
  • In service · EIA-860M

Sources

4 sources

Sources EIA-860M · LBNL · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026
  • LBNLOpen license, with credit · retrieved Nov 13, 2026Yin, Nait Belaid & Heleno (2026), Lawrence Berkeley National Laboratory, OEDI, CC BY 4.0: A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024. Modified by Inframation: HIFLD-side fields only, names re-cased, coordinates rounded.
  • EIAOpen license · retrieved Nov 1, 2026Source: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)
  • EIA-860M Preliminary Monthly Electric Generator Inventory

Every source and license · Attribution

View at source

Around this plant

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
Amazon Data Services Inc IAD-205/307/317/612/612x Filed Large load 1.6 mi
Dominion/Lo Mar Postponed Oil 1.9 mi 5.4
QTS INVESTMENT PROPERTIES MANASSAS LLC Built Large load 2.2 mi
AMAZON DATA SERVICES, INC. IAD-100 IAD-101 IAD-102 IAD-103 Built Large load 2.3 mi
DIGITAL THIRD SECOND MANASSAS, LLC & DIGITAL CARVER BRICKYARD, LLC. Built Large load 2.4 mi
NVA05C DATA CENTER Under construction Large load 2.6 mi
DLR Brickyard - Building B (Manassas data centre) Filed Large load 2.7 mi
MANASSAS CORPORATE CENTER DATA CENTER BUILDING 6 M Built Large load 2.8 mi
QTS MAN1 DC6 - A&A Temp Crane - SW Corner Filed Large load 2.9 mi
SI NVA05D LLC Filed Large load 2.9 mi
Cashvad Ventures LLC Filed Large load 2.9 mi
SI NVA05A, LLC AND SI NVA05D, LLC Built Large load 2.9 mi
MCC7 (Manassas data centre) Filed Large load 2.9 mi
CLOUD HQ Built Large load 2.9 mi
CloudHQ MDC1 Filed Large load 2.9 mi
AMAZON DATA SERVICES (IAD-130, IAD-131, IAD-313, AND DCA-072) Built Large load 3.0 mi
MDC1 DATA CENTER Unknown Large load 3.0 mi
NVA05E Data Center Filed Large load 3.0 mi
IAD 104- 9680 Innovation Dr. Manassas Va. Built Large load 3.1 mi
Amazon Data Services Inc IAD-319 Filed Large load 3.1 mi
IAD319 Filed Large load 3.1 mi
AMAZON DATA SERVICES INC - IAD-104/105/106 Built Large load 3.2 mi
Comcast Cablevision of Virginia Incorporated Built Large load 3.3 mi
AMAZON DATA SERVICES, INC. IAD-132 IAD-133 Built Large load 3.7 mi
CORPORATE OFFICE PROPERTIES TRUST (COPT - DC6) Built Large load 3.8 mi
SI NVA02D, LLC Built Large load 3.9 mi
JK REDSTONE TECH PARK- SOUTH (Manassas data centre) Filed Large load 4.0 mi
Amazon Data Services Inc IAD-45 Filed Large load 4.1 mi
AMAZON DATA SERVICES, INC. IAD-75 IAD-85 IAD-95 IAD-96 Built Large load 4.3 mi
EQUINIX, LLC - DC 14 Built Large load 4.4 mi
Amazon Data Services Inc IAD-310/311/312 Filed Large load 4.4 mi
IAD 210 LTM 1110 Built Large load 4.5 mi
Iron Mountain VA8 and VA9 Filed Large load 4.5 mi
AMAZON DATA SERVICES INC IAD-210/211 Built Large load 4.5 mi
Oath, Inc. Built Large load 4.5 mi
IRON MOUNTAIN INFORMATION MANAGEMENT LLC Built Large load 4.7 mi
Railroad Energy Center, LLC Under construction Storage 4.7 mi 20
Bethlehem Energy Center, LLC - (VA) Under construction Storage 4.8 mi 20
YOUTH FOR TOMORROW DATA CENTER - EARLY GRADING PLA Unknown Large load 4.8 mi
AMAZON DATA SERVICES, INC. IAD-7 IAD-11 IAD-24 Built Large load 4.9 mi
Microsoft - Manassas Data Center - MNZ01 Filed Large load 4.9 mi
IAD 193 - A&A Temporary Crane Filed Large load 5.3 mi
AMAZON DATA SERVICES, INC. IAD-14 IAD-52 IAD-59 Built Large load 5.3 mi
AMAZON DATA SERVICES, INC. IAD-73 IAD-74 IAD-602 IAD-193 IAD-194 Built Large load 5.4 mi
BCG Rose West (Wellington data centre) Filed Large load 5.7 mi
MICROSOFT - GAINESVILLE DATA CENTER - MNZ03 Built Large load 5.9 mi
Project Industry Building 1 (Gainesville data centre) Filed Large load 6.4 mi
NOVA MANGO FARMS LLC Built Large load 6.9 mi
IAD112 NW Filed Large load 6.9 mi
Amazon Data Services, Inc. IAD-110, IAD-111, IAD-112, and IAD-113 Filed Large load 6.9 mi

Sources Virginia DEQ · EIA-860M · EPA ICIS-Air · EPA ICIS-NPDES · FAA OE/AAA

Sources

  • Virginia DEQOpen license · retrieved Nov 4, 2026Source: Virginia Department of Environmental Quality
  • EIA-860MOpen license · retrieved Nov 4, 2026
  • EPA ICIS-AirOpen license · retrieved Nov 16, 2026
  • EPA ICIS-NPDESOpen license · retrieved Nov 16, 2026
  • FAA OE/AAAOpen license · retrieved Nov 16, 2026

Attribution