Citrus Flatts Energy Center, LLC — Power plant · Storage · East Point Energy, LLCHarlingen #1 BESS 1 — Under construction · Storage · TX · 10 MW · 1.3 mi awayAegle Power — Studied · Gas, combined cycle · TX · 1,536.4 MW · 4.6 mi awayProposed Digital Infrastructure Facility (Harlingen data centre) — Filed · Large load · TX · 5.5 mi awayHarryoung PV and BESS — Studied · Solar + storage · TX · 380 MW · 7.1 mi awayArroyo Storage — Under construction · Solar + storage · TX · 283.8 MW · 7.3 mi awayTX18 Cottage Meadow Storage — Postponed · Storage · TX · 100 MW · 8.0 mi awayMesquite Clean Energy Center (BESS) — Under construction · Storage · TX · 10.1 MW · 10.1 mi awayAccalia Point Solar, LLC — Studied · Solar · TX · 190.5 MW · 10.9 mi awayMFE-A-KATI 2 DATA CENTER DEVELOPMENT — Under construction · Large load · TX · 11.5 mi away
  • Combustion
  • Wind & solar
  • Storage
  • Loads
  • In development
  • Under construction
  • Operating
  • Size not stated
  • 10 · 100 · 1,000 MW

Citrus Flatts Energy Center, LLC

Power plant · Storage

Key facts

Power plant · Storage Out of service
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
2023
Grid
138 kV to AEP Texas Central Company (ERCO)
Location
Cameron County, Texas
Operated by
East Point Energy, LLCSourceEIA-860M Preliminary Monthly Electric Generator Inventory

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Storage source: “Batteries”
Age
3 years since 2023
All 3 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Grid
Nerc region
TRE
Report year
2025
Grid voltage kv
138
Transmission owner
AEP Texas Central Company
Balancing authority code
ERCO
Balancing authority name
Electric Reliability Council of Texas, Inc.
Eia status
By code
OA
Mw
100
Units
1
Standby mw
0
Status rule
majority_mw_out_of_service
In service mw
100
Out of service mw
100
Balancing authority codeERCO

Timeline

  • In service · EIA-860M

Around this plant

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
Harlingen #1 BESS 1 Under construction Storage 1.3 mi 10
Aegle Power Studied Gas, combined cycle 4.6 mi 1,536.4
Proposed Digital Infrastructure Facility (Harlingen data centre) Filed Large load 5.5 mi
Harryoung PV and BESS Studied Solar + storage 7.1 mi 380
Arroyo Storage Under construction Solar + storage 7.3 mi 283.8
TX18 Cottage Meadow Storage Postponed Storage 8.0 mi 100
Mesquite Clean Energy Center (BESS) Under construction Storage 10.1 mi 10.1
Accalia Point Solar, LLC Studied Solar 10.9 mi 190.5
MFE-A-KATI 2 DATA CENTER DEVELOPMENT Under construction Large load 11.5 mi

Sources EIA-860M · ERCOT · FAA OE/AAA · EPA ICIS-NPDES

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026
  • ERCOTOpen license · retrieved Nov 4, 2026
  • FAA OE/AAAOpen license · retrieved Nov 16, 2026
  • EPA ICIS-NPDESOpen license · retrieved Nov 16, 2026

Attribution