Show on map
- Combustion
- Wind & solar
- Storage
- Loads
- In development
- Under construction
- Size not stated
- Other infrastructure
- 10 · 100 · 1,000 MW
Map
- Combustion
- Wind & solar
- Storage
- Loads
- In development
- Under construction
- Size not stated
- Other infrastructure
CK Red River: route and 12 exact-grade projects within 15 mi. Basemap: Protomaps, © OpenStreetMap contributors, ODbL.
CK Red River
Crude oil pipeline
Key facts
Crude oil pipeline Operating- Mapped route length
- Mapped route length: sourceEIA Energy Atlas · Open licensemiles
- States crossed
- US-OK, US-TX
- Operated by
- Plains All American PipelineSourceEIA US Energy Atlas — Crude Oil Pipelines (line geometries, operator, pipeline name)
Details
Who’s behind it
No companies named in filings yet.
Interested in this project?
Set an alert Book a call Join the beta
Our team gets you what you need.
Beta: private project space · data room · readiness check
- Mapped route length (miles)
- 330
- Units
- 1
All 5 attributes from EIA US Energy Atlas — Crude Oil Pipelines (line geometries, operator, pipeline name)
| Attribute | Value |
|---|---|
| Mapped parts | 1 |
| Operator, as the source states it | PLAINS ALL AMERICAN PIPELINE |
| Mapped segments | 1 |
| Source release | 202001 |
| Pipeline name raw | CK Red River |
Sources
2 sourcesSources EIA Energy Atlas · EIA US Energy Atlas — Crude Oil Pipelines (line geometries, operator, pipeline name)
Sources
- EIA Energy AtlasSource: U.S. Energy Information Administration, U.S. Energy Atlas, Crude Oil Pipelines (as of January 2020)
- EIA US Energy Atlas — Crude Oil Pipelines (line geometries, operator, pipeline name)
Around this pipeline
Nearby
within 15 mi| Project | Kind | Away | MW |
|---|---|---|---|
| Hallmark Postponed | Solar | 1.6 mi | 42 |
| Cedar Range Solar Contracted | Solar | 1.9 mi | 150.6 |
| West Moore Solar Postponed | Solar | 2.0 mi | 5 |
| Willis Storage Contracted | Storage | 5.1 mi | 176.1 |
| Van Alstyne Energy Center Postponed | Gas, combustion turbine | 5.4 mi | 549 |
| Lucky 7 Solar Farm LLC Under construction | Solar | 7.1 mi | 101.3 |
| Mcmurtre Storage Contracted | Storage | 9.0 mi | 177.6 |
| Sandman Solar Postponed | Storage | 10.2 mi | 100 |
| Majors DC Site – Data Center Building #1 Filed | Large load | 10.4 mi | |
| Solemio LLC Postponed | Solar | 11.7 mi | 80 |
| Valley (TX) Postponed | Coal | 12.2 mi | 800 |
| Ripley Energy Center Under construction | Gas, combustion turbine | 14.1 mi | 419 |
Sources EIA-860M · ERCOT · FAA OE/AAA