Clarkstown Landfill Solar Facility — Power plant · Solar · Clarkstown Solar LLCORANGETOWN DATA CENTER — Built · Large load · NY · 3.7 mi awayDATA CENTER BUILDING EXPANSION — Under construction · Large load · NY · 4.7 mi awayBowline Point — Postponed · Gas, combined cycle · NY · 750 MW · 7.2 mi awayNYSE DATA CENTER CRANE — Filed · Large load · NJ · 10.7 mi away
  • Wind & solar
  • Loads
  • In development
  • Under construction
  • Operating
  • Size not stated
  • 10 · 100 · 1,000 MW

Clarkstown Landfill Solar Facility

Power plant · Solar

Key facts

Power plant · Solarran 11% of 2025 Operating
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
2014
Net generation, 2025
1,957 MWh
Grid
13 kV to Orange & Rockland Utils Inc (NYIS)
Location
Rockland County, New York
Operated by
Clarkstown Solar LLCSourceEIA-860M Preliminary Monthly Electric Generator Inventory

Output

Net generation MWh by year, 2015 to 2025

Operations detail

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Solar source: “Solar Photovoltaic”
Age
12 years since 2014
All 6 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Gem
Unit ids
G100000815136, G100000815137
Location id
L100000812506
Eia plant ids
60004
Grid
Nerc region
NPCC
Report year
2025
Grid voltage kv
13.20
Transmission owner
Orange & Rockland Utils Inc
Balancing authority code
NYIS
Balancing authority name
New York Independent System Operator
Fuel burned (MMBtu), 20256,676
Capacity factor, 20250.112
Net generation (MWh), 20251,957
Balancing authority codeNYIS

Solar array

Array area (acres)
10.3
AC capacity (MW)
2
DC capacity (MW)
2
Mounting
Fixed tilt
Site type
Name includes "landfill" (not on EPA's landfill list)
Began operating
2014

Source USPVDB

Source

  • USPVDBOpen license · retrieved Oct 25, 2026Map services and data are available from Large-Scale Solar Photovoltaic Database, provided by the U.S. Geological Survey and Lawrence Berkeley National Laboratory via https://energy.usgs.gov/uspvdb

Attribution

Timeline

  • In service · EIA-860M

Sources

5 sources

Sources EIA-860M · GEM · USPVDB · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026
  • GEMOpen license, with credit · retrieved Oct 26, 2026Global Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.
  • USPVDBOpen license · retrieved Oct 25, 2026Map services and data are available from Large-Scale Solar Photovoltaic Database, provided by the U.S. Geological Survey and Lawrence Berkeley National Laboratory via https://energy.usgs.gov/uspvdb
  • EIAOpen license · retrieved Nov 1, 2026Source: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)
  • EIA-860M Preliminary Monthly Electric Generator Inventory

Every source and license · Attribution

View at source

Around this plant

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
ORANGETOWN DATA CENTER Built Large load 3.7 mi
DATA CENTER BUILDING EXPANSION Under construction Large load 4.7 mi
Bowline Point Postponed Gas, combined cycle 7.2 mi 750
NYSE DATA CENTER CRANE Filed Large load 10.7 mi