Clay - Sithe 345 kV — Transmission lineSunEast Clay Solar Project — Postponed · Solar · NY · 50 MW · 0.7 km awayBartell South PV I — Under construction · Solar · NY · 3 MW · 3.9 km awayMallory South PV I — Under construction · Solar · NY · 5 MW · 5.1 km awayMallory South PV II — Under construction · Solar · NY · 5 MW · 5.1 km awayCold Springs — Under construction · Solar · NY · 5 MW · 10.9 km awayLysander III PV — Under construction · Solar · NY · 2.4 MW · 12.7 km awayMexico PV, LLC — Under construction · Solar · NY · 4.5 MW · 13.8 km awayWest Genesee — Under construction · Solar · NY · 2.9 MW · 19.0 km awayRichland III Solar — Postponed · Solar · NY · 79.9 MW · 21.1 km away
  • Wind & solar
  • Under construction
  • Other infrastructure
  • 10 · 100 · 1,000 MW

Clay - Sithe 345 kV

Transmission line

Mapped route length
Mapped route length: sourceLBNL · Open license, with creditmiles
Voltage
345 kV
States crossed
US-NY
Owner (as stated)
Niagara Mohawk Power

Details

Who’s behind it

Owner
Niagara Mohawk Power

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Mapped route length (miles)
29
Substations at the ends (as the source names them)
Clay to Sithe
All 3 attributes from LBNL — A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024 (OEDI submission 8742)
Attributes
AttributeValue
Owner, as the source states itniagara mohawk power
HIFLD line ID108526
Voltage class345 kV

Sources

1 source

Sources LBNL

Sources

  • LBNLOpen license, with credit · retrieved Nov 9, 2026Yin, Nait Belaid & Heleno (2026), Lawrence Berkeley National Laboratory, OEDI, CC BY 4.0: A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024. Modified by Inframation: HIFLD-side fields only, names re-cased, coordinates rounded.

Every source and license · Attribution

View at source

Around this line

Nearby

within 25 km
Projects within 25 km, nearest first.
ProjectKindAwayMW
SunEast Clay Solar Project Postponed Solar 0.7 km 50
Bartell South PV I Under construction Solar 3.9 km 3
Mallory South PV I Under construction Solar 5.1 km 5
Mallory South PV II Under construction Solar 5.1 km 5
Cold Springs Under construction Solar 10.9 km 5
Lysander III PV Under construction Solar 12.7 km 2.4
Mexico PV, LLC Under construction Solar 13.8 km 4.5
West Genesee Under construction Solar 19.0 km 2.9
Richland III Solar Postponed Solar 21.1 km 79.9

Sources EIA-860M

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026

Attribution