Clear Springs 345 kV line: route and 14 exact-grade projects within 15 mi. Basemap: Protomaps, © OpenStreetMap contributors, ODbL.
Clear Springs 345 kV line
Transmission line
- Mapped route length
- Mapped route length: sourceLBNL · Open license, with creditmiles
- Voltage
- 345 kV
- States crossed
- US-TX
- Owner (as stated)
- Bluebonnet Electric Coop
Details
Who’s behind it
- Owner
- Bluebonnet Electric Coop
Interested in this project?
Set an alert Book a call Join the beta
Our team gets you what you need.
Beta: private project space · data room · readiness check
- Mapped route length (miles)
- 70
- Substations at the ends (as the source names them)
- Clear Springs
All 3 attributes from LBNL — A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024 (OEDI submission 8742)
| Attribute | Value |
|---|---|
| Owner, as the source states it | bluebonnet electric coop |
| HIFLD line ID | 306344 |
| Voltage class | 345 kV |
Sources
1 sourceSources LBNL
Sources
- LBNLYin, Nait Belaid & Heleno (2026), Lawrence Berkeley National Laboratory, OEDI, CC BY 4.0: A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024. Modified by Inframation: HIFLD-side fields only, names re-cased, coordinates rounded.
Around this line
Nearby
within 15 mi| Project | Kind | Away | MW |
|---|---|---|---|
| Austin TX GigaFactory × 2 units Under construction | Solar | 0.2 mi | 3.3 |
| Clear Springs Energy Center Postponed | Gas, combustion turbine | 0.3 mi | 549 |
| Pecan Crossing Building 2 (Pflugerville data centre) Filed | Large load | 0.4 mi | |
| CLOUDBURST DATA CENTERS Under construction | Large load | 1.4 mi | |
| SMT DC Austin I (Austin data centre) Filed | Large load | 2.5 mi | |
| Metro BESS Studied | Storage | 2.7 mi | 200.7 |
| AMD Phase 2 (Austin data centre) Filed | Large load | 4.0 mi | |
| AUSTIN DATA CENTER 2 Under construction | Large load | 5.6 mi | |
| SABEY DATA CENTER AUSTIN Under construction | Large load | 6.7 mi | |
| Building B (Round Rock data centre) Filed | Large load | 6.8 mi | |
| Guadalupe Generating Station Postponed | Gas, combustion turbine | 7.7 mi | 320 |
| HUTTO DATA CENTER CAMPUS Built | Large load | 9.5 mi | |
| Dogwood Creek Solar and BESS Postponed | Solar + storage | 12.1 mi | 878.7 |