Show on map
Clifton Dam 3 Power Station — Power plant · Hydro · Converse Energy IncVALARA HOLDINGS HIGH PERFORMANCE COMPUTE CENTER — Under construction · Large load · SC · 4.8 mi awayFairview Solar — Postponed · Solar · SC · 2 MW · 6.0 mi awayDavis Road Solar — Postponed · Solar · SC · 2 MW · 6.2 mi awayHighway 9 Solar — Postponed · Solar · SC · 2 MW · 7.3 mi awayTurkey Hill Solar I — Postponed · Solar · SC · 2 MW · 8.3 mi awayInnovative Solar 33 — Postponed · Solar · NC · 30.5 MW · 14.9 mi away
  • Clean firm
  • Loads
  • Under construction
  • Operating
  • Size not stated
  • 10 · 100 · 1,000 MW

Clifton Dam 3 Power Station

Power plant · Hydro

Key facts

Power plant · Hydroran 35% of 2024 Operating
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
1985
Net generation, 2024
3,660 MWh
Grid
13 kV to Duke Energy Carolinas, LLC (DUK)
Location
Spartanburg County, South Carolina
Operated by
Converse Energy IncSourceEIA-860M Preliminary Monthly Electric Generator Inventory

Output

Net generation MWh by year, 2001 to 2024

Operations detail

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Hydro source: “Conventional Hydroelectric”
Age
41 years since 1985
All 2 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Grid
Nerc region
SERC
Report year
2025
Grid voltage kv
13
Transmission owner
Duke Energy Carolinas, LLC
Balancing authority code
DUK
Balancing authority name
Duke Energy Carolinas
Balancing authority codeDUK

Timeline

  • In service · EIA-860M

Sources

3 sources

Sources EIA-860M · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory

Sources

Every source and license · Attribution

View at source

Around this plant

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
VALARA HOLDINGS HIGH PERFORMANCE COMPUTE CENTER Under construction Large load 4.8 mi
Fairview Solar Postponed Solar 6.0 mi 2
Davis Road Solar Postponed Solar 6.2 mi 2
Highway 9 Solar Postponed Solar 7.3 mi 2
Turkey Hill Solar I Postponed Solar 8.3 mi 2
Innovative Solar 33 Postponed Solar 14.9 mi 30.5

Sources EPA ICIS-Air · EIA-860M

Sources

Attribution