Clifton
Power plant · Gas, combustion turbine
Key facts
Power plant · Gas, combustion turbineran 0% of 2025 Retiring- Capacity
- Capacity: sourceEIA-860M · Open licenseMW
- Commissioned
- 1974
- Net generation, 2025
- 923 MWh
- Grid
- 115 kV to Sunflower Electric Power Corp (SWPP)
- Location
- Washington County, Kansas
- Operated by
- Sunflower Electric Power Corp
Output
- Gas
- Oil
Details
Who’s behind it
Interested in this project?
Set an alert Book a call Join the beta
Our team gets you what you need.
Beta: private project space · data room · readiness check
- Technology
- Gas, combustion turbine source: “Natural Gas Fired Combustion Turbine”
- Age
- 52 years since 1974
All 6 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
| Attribute | Value |
|---|---|
| EPA greenhouse gas reporting (GHGRP) |
|
| Eia status |
|
| Fuel burned (MMBtu), 2025 | 29,007 |
| Capacity factor, 2025 | 0.001 |
| Net generation (MWh), 2025 | 923.0 |
| Balancing authority code | SWPP |
Data notes (1)
- Heat rate (Btu/kWh), 2025 not shown: computed 31426.9 outside 5000-30000 Btu/kWh
Retirement
EIA-860M September 2026StatusAt least half of the plant's in-service nameplate capacity is scheduled to retire, on dates its owner has reported to EIA. As of EIA-860M for September 2026.- Next scheduled retirement
- June 2028
- Capacity scheduled to retire
- 87.5 MW
- Generators scheduled to retire
- 2
- Share of in-service capacity scheduled
- 100%
- Capacity still in service
- 87.5 MW
| Generator | Technology | Nameplate | State | Date |
|---|---|---|---|---|
| 1 | Natural Gas Fired Combustion Turbine | 85 MW | Scheduled to retire | June 2028 |
| 2 | Petroleum Liquids | 2.5 MW | Scheduled to retire | June 2028 |
By technology
| Technology | Retired | Scheduled to retire |
|---|---|---|
| Natural Gas Fired Combustion Turbine | 85 MW | |
| Petroleum Liquids | 2.5 MW |
Grid
EIA-860 2025Grid fieldsAs the plant reported them to EIA-860 for 2025 (Schedule 2).- Grid voltage at the plant
- 115 kV
- Transmission or distribution system owner
- Sunflower Electric Power Corp
- Balancing authority
- Southwest Power Pool
- NERC region
- MRO
Can the connection be reused?
A plant that retires usually leaves its substation, transmission connection and interconnection agreement behind, and those may be reusable by a new project at the same site. FERC Order No. 845 lets an interconnection customer use surplus interconnection service at an existing site, and some transmission providers' tariffs let a replacement resource take over a retiring unit's interconnection service, usually within a set time after the retirement. Whether any such right still exists here, who holds it and on what terms depends on the owner, the transmission provider and timing; this page does not establish any of that.
Ownership
2 companies2| Company | Role | Share | As of | Source |
|---|---|---|---|---|
| SUNFLOWER ELECTRIC POWER CORP | Operator | EIA-860M | ||
| MID KANSAS ELECTRIC CO LLC | Owner | 100.0% | Dec 31, 2023 | EPA GHGRP |
Timeline
- Stated Units 1, 2 scheduled to retire, 87.5 MW · EIA-860M
- In service · EIA-860M
Sources
4 sourcesSources EIA-860M · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory · EPA Greenhouse Gas Reporting Program — facility register with parent-company shares (Envirofacts pub_dim_facility; FLIGHT)
Sources
- EIA-860M
- EIASource: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)
- EIA-860M Preliminary Monthly Electric Generator Inventory
- EPA Greenhouse Gas Reporting Program — facility register with parent-company shares (Envirofacts pub_dim_facility; FLIGHT)