Show on map
Coidgen — Power plant · Gas, combined cycle · Sunlaw Energy Partners I LPWestminster Reliability Project, LLC — Storage · CA · 110 MW · 6.6 km awayVS HR Warner NEM, LLC — Solar · CA · 1 MW · 15.3 km awaySolar Photovoltaic Project #47 — Solar · CA · 1 MW · 17.4 km awaySouth Bay Dis Ctr 6-SLLAX680 — Solar · CA · 1.3 MW · 18.5 km awayFordyce - SLLAX680 — Solar · CA · 1.3 MW · 18.5 km awaySouth Bay Dis Ctr 12 - SLLAX104 — Solar · CA · 1.2 MW · 18.5 km awayDominguez - SLLAX512 — Solar · CA · 1.3 MW · 18.9 km awayBandini - SLLAX710 — Solar · CA · 1.3 MW · 19.8 km awayElevate Pier S — Storage · CA · 70 MW · 19.9 km awaySanta Ana Storage 3 — Storage · CA · 40 MW · 20.4 km awayWatson Cogeneration — Gas, combined cycle · CA · 94.2 MW · 20.4 km awayMarici — Storage · CA · 400 MW · 20.9 km awayCPA 3777 Workman — Solar · CA · 1.9 MW · 21.1 km away
  • Combustion
  • Wind & solar
  • Storage
  • In development
  • Under construction
  • Retired
  • 10 · 100 · 1,000 MW

Power plant · Gas, combined cycle

Key facts

Power plant · Gas, combined cycleran 3% of 2002 Retired
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
1986
Net generation, 2002
8,963 MWh
Location
Los Angeles County, California
Operated by
Sunlaw Energy Partners I LPSourceEIA-860M Preliminary Monthly Electric Generator Inventory

Output

Net generation MWh by year, 2001 to 2002
Fuel burned MMBtu by year, 2001 to 2002
  • Gas

Operations detail

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Gas, combined cycle source: “Natural Gas Fired Combined Cycle”
Age
40 years since 1986

Retirement

EIA-860M September 2026StatusEvery generator EIA lists at this plant has retired. As of EIA-860M for September 2026.
Retired
August 2002
Capacity retired
33 MW
Generators retired
2
Generators that retired or are scheduled to retire
GeneratorTechnologyNameplateStateDate
GEN1Natural Gas Fired Combined Cycle26 MWRetiredAugust 2002
GEN2Natural Gas Fired Combined Cycle7 MWRetiredAugust 2002

Grid

Not in EIA-860Grid fieldsEIA-860 states no grid voltage or transmission owner for this plant: its annual file lists plants with a generator in the report year, so a plant that retired earlier is not in it.
Transmission lines within 25 km (10)
Connection points within 25 km (2)
Can the connection be reused?

A plant that retires usually leaves its substation, transmission connection and interconnection agreement behind, and those may be reusable by a new project at the same site. FERC Order No. 845 lets an interconnection customer use surplus interconnection service at an existing site, and some transmission providers' tariffs let a replacement resource take over a retiring unit's interconnection service, usually within a set time after the retirement. Whether any such right still exists here, who holds it and on what terms depends on the owner, the transmission provider and timing; this page does not establish any of that.

Timeline

  • Stated Units GEN1, GEN2 scheduled to retire, 33 MW · EIA-860M
  • In service · EIA-860M

Sources

5 sources

Sources EIA-860M · LBNL · CAISO · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory

Sources

Every source and license · Attribution

View at source

Around this plant

Nearby

within 25 km
Projects within 25 km, nearest first.
ProjectKindAwayMW
Westminster Reliability Project, LLC Under construction Storage 6.6 km 110
VS HR Warner NEM, LLC Under construction Solar 15.3 km 1
Solar Photovoltaic Project #47 Postponed Solar 17.4 km 1
South Bay Dis Ctr 6-SLLAX680 Under construction Solar 18.5 km 1.3
Fordyce - SLLAX680 Under construction Solar 18.5 km 1.3
South Bay Dis Ctr 12 - SLLAX104 Under construction Solar 18.5 km 1.2
Dominguez - SLLAX512 Under construction Solar 18.9 km 1.3
Bandini - SLLAX710 Under construction Solar 19.8 km 1.3
Elevate Pier S Filed Storage 19.9 km 70
Santa Ana Storage 3 Postponed Storage 20.4 km 40
Watson Cogeneration Withdrawn Gas, combined cycle 20.4 km 94.2
Marici Under construction Storage 20.9 km 400
CPA 3777 Workman Postponed Solar 21.1 km 1.9

Sources EIA-860M · CAISO

Sources

Attribution