Power plant · Gas, reciprocating engine

Key facts

Power plant · Gas, reciprocating engineran 0% of 2012 Retired
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
1948
Net generation, 2012
84 MWh
Location
Branch County, Michigan
Operated by
Coldwater Board of Public UtilSourceEIA-860M Preliminary Monthly Electric Generator Inventory

Output

Net generation MWh by year, 2001 to 2013
Fuel burned MMBtu by year, 2001 to 2013
  • Gas
  • Oil

Operations detail

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Gas, reciprocating engine source: “Natural Gas Internal Combustion Engine”
Age
78 years since 1948
1 attribute from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Balancing authority codeMISO

Retirement

EIA-860M September 2026StatusEvery generator EIA lists at this plant has retired. As of EIA-860M for September 2026.
Retired
September 2014
First unit retired
December 2002
Capacity retired
12.7 MW
Generators retired
4
Generators that retired or are scheduled to retire
GeneratorTechnologyNameplateStateDate
1Petroleum Liquids0.7 MWRetiredDecember 2002
3Natural Gas Internal Combustion Engine3.5 MWRetiredSeptember 2012
IC5Natural Gas Internal Combustion Engine6 MWRetiredNovember 2013
IC4Petroleum Liquids2.5 MWRetiredSeptember 2014
By technology
Nameplate capacity retired or scheduled to retire, by technology
TechnologyRetiredScheduled to retire
Natural Gas Internal Combustion Engine9.5 MW
Petroleum Liquids3.2 MW

Grid

EIA-860Grid fieldsAs the plant reported them to EIA-860 (Schedule 2).
Balancing authority
MISO
Transmission lines within 25 km (5)
Can the connection be reused?

A plant that retires usually leaves its substation, transmission connection and interconnection agreement behind, and those may be reusable by a new project at the same site. FERC Order No. 845 lets an interconnection customer use surplus interconnection service at an existing site, and some transmission providers' tariffs let a replacement resource take over a retiring unit's interconnection service, usually within a set time after the retirement. Whether any such right still exists here, who holds it and on what terms depends on the owner, the transmission provider and timing; this page does not establish any of that.

Timeline

  • Stated Unit IC4 scheduled to retire, 2.5 MW · EIA-860M
  • Stated Unit IC5 scheduled to retire, 6 MW · EIA-860M
  • Stated Unit 3 scheduled to retire, 3.5 MW · EIA-860M
  • Stated Unit 1 scheduled to retire, 0.7 MW · EIA-860M
  • In service · EIA-860M

Sources

4 sources

Sources EIA-860M · LBNL · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory

Sources

Every source and license · Attribution

View at source

Around this plant

Nearby

within 25 km
Projects within 25 km, nearest first.
ProjectKindAwayMW
Cold Creek Solar Park Under construction Solar 0.9 km 100

Sources EIA-860M

Sources

Attribution