Show on map
Coleman — Power plant · Oil · City of Sikeston - (MO)Essex — Gas, combustion turbine · MO · 108 MW · 19.5 km awayMorley Solar — Solar · MO · 100 MW · 19.5 km away
  • Combustion
  • Retired
  • 10 · 100 · 1,000 MW

Power plant · Oil

Key facts

Power plant · Oil Retired
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
1965
Net generation, 2011
0 MWh
Grid
161 kV to City of Sikeston (SPA)
Location
Scott County, Missouri
Operated by
City of Sikeston - (MO)SourceEIA-860M Preliminary Monthly Electric Generator Inventory

Output

Net generation MWh by year, 2001 to 2011
Fuel burned MMBtu by year, 2001 to 2011
  • Oil

Operations detail

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Oil source: “Petroleum Liquids”
Age
61 years since 1965
1 attribute from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Balancing authority codeSPA

Retirement

EIA-860M September 2026StatusEvery generator EIA lists at this plant has retired. As of EIA-860M for September 2026.
Retired
June 2011
Capacity retired
4.3 MW
Generators retired
2
Generators that retired or are scheduled to retire
GeneratorTechnologyNameplateStateDate
IC1Petroleum Liquids2 MWRetiredJune 2011
IC2Petroleum Liquids2.3 MWRetiredJune 2011

Grid

EIA-860 2025Grid fieldsAs the plant reported them to EIA-860 for 2025 (Schedule 2).
Grid voltage at the plant
161 kV
Transmission or distribution system owner
City of Sikeston
Balancing authority
Southwestern Power Administration
NERC region
SERC
Transmission lines within 25 km (4)
Can the connection be reused?

A plant that retires usually leaves its substation, transmission connection and interconnection agreement behind, and those may be reusable by a new project at the same site. FERC Order No. 845 lets an interconnection customer use surplus interconnection service at an existing site, and some transmission providers' tariffs let a replacement resource take over a retiring unit's interconnection service, usually within a set time after the retirement. Whether any such right still exists here, who holds it and on what terms depends on the owner, the transmission provider and timing; this page does not establish any of that.

Timeline

  • Stated Units IC1, IC2 scheduled to retire, 4.3 MW · EIA-860M
  • In service · EIA-860M

Sources

4 sources

Sources EIA-860M · LBNL · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory

Sources

Every source and license · Attribution

View at source

Around this plant

Nearby

within 25 km
Projects within 25 km, nearest first.
ProjectKindAwayMW
Essex Postponed Gas, combustion turbine 19.5 km 108
Morley Solar Postponed Solar 19.5 km 100

Sources EIA-860M

Sources

Attribution