Show on map
Combination Project - Denver Regional Landfill (North) — RNG project · Landfill gas to electricity · Archaea Energy, LLC; Timberline Energy, LLCFront Range Project — Postponed · Biomass · CO · 1.6 MW · 1.0 mi awayJPMORGAN CHASE - PROJ SYCAMORE-BROOMFIEL — Built · Large load · CO · 4.1 mi awaySpindle BESS — Under construction · Battery storage · CO · 199 MW · 6.4 mi awayAMERICAN HONDA MOTORS CO. - DATA CENTER — Built · Large load · CO · 9.9 mi awayORACLE AMERICA - BROOMFIELD CAMPUS — Built · Large load · CO · 10.5 mi awayLOCKHEED MARTIN - DENVER DATA CENTER — Built · Large load · CO · 14.6 mi away
  • Storage
  • Loads
  • Under construction
  • Operating
  • Size not stated
  • Other infrastructure
  • 10 · 100 · 1,000 MW

Combination Project - Denver Regional Landfill (North)

RNG project · Landfill gas to electricity

Key facts

RNG project · Landfill gas to electricity Operating
Location
Weld County, Colorado
Operated by
Archaea Energy, LLC; Timberline Energy, LLCSourceEPA Landfill Methane Outreach Program (LMOP) Landfill and Project Database — landfill gas energy projects (owner/developer, project type, capacity, status)

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert
More Book a call Join the beta
About these actionsOur team gets you what you need. Beta: private project space · data room · readiness check Want this as data? Free via the API and alerts.
Project type
Reciprocating Engine
Technology
Landfill gas to electricity
Rated capacity
3.2 MW
LFG flow to project
1.27 MMscf/d
Start year
2011

Capacity not stated

All 11 attributes from EPA Landfill Methane Outreach Program (LMOP) Landfill and Project Database — landfill gas energy projects (owner/developer, project type, capacity, status)
Attributes
AttributeValue
Landfills3
Actual generation (MW)1.62
Landfill opened1984
Landfill closure year1992
Waste in place (tons)6,319,775
Waste in place, year1992
Landfill design capacity (tons)6,319,775
Landfill gas collected (MMscf/d)0.234
Landfill gas generated (MMscf/d)0.316
Direct emission reductions (MMTCO2e/yr)0.027
Avoided emissions (MMTCO2e/yr)0.003

Timeline

  • In service · EPA LMOP

Around this asset

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
Front Range Project Postponed Biomass 1.0 mi 1.6
JPMORGAN CHASE - PROJ SYCAMORE-BROOMFIEL Built Large load 4.1 mi
Spindle BESS Under construction Battery storage 6.4 mi 199
AMERICAN HONDA MOTORS CO. - DATA CENTER Built Large load 9.9 mi
ORACLE AMERICA - BROOMFIELD CAMPUS Built Large load 10.5 mi
LOCKHEED MARTIN - DENVER DATA CENTER Built Large load 14.6 mi