Front Range Project
Biomass
- Capacity
- Capacity: sourceEIA-860M · Open licenseMW
- Interconnection queue
- Western Area Power Administration, Rocky Mountain Region (WACM)
- Location
- Weld County, Colorado
Details
Who’s behind it
- Developer
- Timberline Energy LLC
Interested in this project?
Set an alert Book a call Join the beta
Our team gets you what you need.
Beta: private project space · data room · readiness check
- Kind
- Generation
- Technology
- Biomass source: “Landfill Gas”
- EIA plant
- 59143 generator FR-2
Timeline
- Observed as postponed in EIA-860M (source status: “Canceled or Postponed”).
“Stated” dates are the source’s plan, not a commitment.
About these dates
Status and dates as the source last listed them. Later changes follow as we see them.
Sources
1 sourceSources EIA-860M
Around this project
Nearby
within 25 km| Project | Kind | Away | MW |
|---|---|---|---|
| JPMORGAN CHASE - PROJ SYCAMORE-BROOMFIEL Built | Large load | 4.9 km | |
| Spindle BESS Under construction | Storage | 11.3 km | 199 |
| ORACLE AMERICA - BROOMFIELD CAMPUS Built | Large load | 15.7 km | |
| AMERICAN HONDA MOTORS CO. - DATA CENTER Built | Large load | 17.0 km | |
| LOCKHEED MARTIN - DENVER DATA CENTER Built | Large load | 21.9 km | |
| Crusoe Brighton Buildout TI Filed | Large load | 24.3 km |
Sources EPA ICIS-Air · EIA-860M · FAA OE/AAA