Front Range ProjectJPMORGAN CHASE - PROJ SYCAMORE-BROOMFIEL — Built · Large load · CO · 4.9 km awaySpindle BESS — Under construction · Storage · CO · 199 MW · 11.3 km awayORACLE AMERICA - BROOMFIELD CAMPUS — Built · Large load · CO · 15.7 km awayAMERICAN HONDA MOTORS CO. - DATA CENTER — Built · Large load · CO · 17.0 km awayLOCKHEED MARTIN - DENVER DATA CENTER — Built · Large load · CO · 21.9 km awayCrusoe Brighton Buildout TI — Filed · Large load · CO · 24.3 km away
  • Storage
  • Loads
  • In development
  • Under construction
  • Operating
  • Size not stated
  • 10 · 100 · 1,000 MW

Front Range Project

Biomass

Capacity
Capacity: sourceEIA-860M · Open licenseMW
Interconnection queue
Western Area Power Administration, Rocky Mountain Region (WACM)
Location
Weld County, Colorado

Details

Who’s behind it

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Kind
Generation
Technology
Biomass source: “Landfill Gas”
EIA plant
59143 generator FR-2

Timeline

  • Observed as postponed in EIA-860M (source status: “Canceled or Postponed”).

“Stated” dates are the source’s plan, not a commitment.

About these dates

Status and dates as the source last listed them. Later changes follow as we see them.

Sources

1 source

Sources EIA-860M

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026

Every source and license · Attribution

View at source

Report a problem

Around this project

Nearby

within 25 km
Projects within 25 km, nearest first.
ProjectKindAwayMW
JPMORGAN CHASE - PROJ SYCAMORE-BROOMFIEL Built Large load 4.9 km
Spindle BESS Under construction Storage 11.3 km 199
ORACLE AMERICA - BROOMFIELD CAMPUS Built Large load 15.7 km
AMERICAN HONDA MOTORS CO. - DATA CENTER Built Large load 17.0 km
LOCKHEED MARTIN - DENVER DATA CENTER Built Large load 21.9 km
Crusoe Brighton Buildout TI Filed Large load 24.3 km