Show on map
Combination Project - Expansion #1 - GROWS Landfill — RNG project · Landfill gas to electricity · WM Renewable Energy LLCAMAZON DATA SVCS INC PNE100 — Built · Large load · PA · 1.4 mi awayVicinity Energy Trenton, L.P. — Postponed · Gas, combustion turbine · NJ · 9.2 MW · 4.0 mi awayMCGRAW HILL INC — Built · Large load · NJ · 14.4 mi awayQTS INVESTMENTS PROPERTIES PRINCETON LLC — Built · Large load · NJ · 14.5 mi away
  • Loads
  • Operating
  • Size not stated
  • Other infrastructure
  • 10 · 100 · 1,000 MW

Combination Project - Expansion #1 - GROWS Landfill

RNG project · Landfill gas to electricity

Key facts

RNG project · Landfill gas to electricity Retired
Location
Bucks County, Pennsylvania
Operated by
WM Renewable Energy LLCSourceEPA Landfill Methane Outreach Program (LMOP) Landfill and Project Database — landfill gas energy projects (owner/developer, project type, capacity, status)

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Project type
Steam Turbine
Technology
Landfill gas to electricity
Rated capacity
10 MW
Start year
2002

Capacity not stated

All 12 attributes from EPA Landfill Methane Outreach Program (LMOP) Landfill and Project Database — landfill gas energy projects (owner/developer, project type, capacity, status)
Attributes
AttributeValue
EPA Renewable Fuel Standard registration
RIN D-codes
D3
Company
WM Renewable Energy, L.L.C.
Facility
FAIRLESS RNG
Facility type
Gas/Ethanol
Approved pathways
1
Landfills1
Actual generation (MW)7
Landfill opened1970
Landfill closure year2017
Project shutdown year2020
Waste in place (tons)65,613,970
Waste in place, year2016
Landfill design capacity (tons)69,980,857
Landfill gas collected (MMscf/d)15.14
Direct emission reductions (MMTCO2e/yr)0
Avoided emissions (MMTCO2e/yr)0
Data notes (1)
  • First registered not shown: EPA's Part 80 registration list is a current-state snapshot and states no registration or approval date

Timeline

  • In service · EPA LMOP

Around this asset

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
AMAZON DATA SVCS INC PNE100 Built Large load 1.4 mi
Vicinity Energy Trenton, L.P. Postponed Gas, combustion turbine 4.0 mi 9.2
MCGRAW HILL INC Built Large load 14.4 mi
QTS INVESTMENTS PROPERTIES PRINCETON LLC Built Large load 14.5 mi

Sources EPA ICIS-Air · EIA-860M

Sources

Attribution