- Combustion
- Operating
- 10 · 100 · 1,000 MW
Map
- Combustion
- Operating
Concord: location. Basemap: Protomaps, © OpenStreetMap contributors, ODbL.
Concord
Power plant · Gas, combustion turbine
Key facts
Power plant · Gas, combustion turbineran 6% of 2025 Operating- Capacity
- Capacity: sourceEIA-860M · Open licenseMW
- Commissioned
- 1993
- Net generation, 2025
- 203,387 MWh
- Grid
- 138 kV to American Transmission Co (MISO)
- Location
- Jefferson County, Wisconsin
- Operated by
- Wisconsin Electric Power Co
Operations
- Net generation, 2025
- 203,387
MWh - Fuel burned, 2025
- 2,761,580
MMBtu - Capacity factor, 2025
- 6.1
% - Heat rate, 2025
- 13,578
Btu/kWh
| Year | Net generation (MWh) | Fuel burned (MMBtu) | Capacity factor | Heat rate (Btu/kWh) |
|---|---|---|---|---|
| 2025 | 203,387 | 2,761,580 | 6.1% | 13,578 |
| 2024 | 175,184 | 2,312,453 | 5.2% | 13,200 |
| 2023 | 119,825 | 1,493,335 | 3.6% | 12,463 |
| 2022 | 203,109 | 2,662,877 | 6.1% | 13,111 |
| 2021 | 142,894 | 1,981,125 | 4.3% | 13,864 |
| 2020 | 85,461 | 1,192,727 | 2.5% | 13,956 |
| 2019 | 82,828 | 1,151,954 | 2.5% | 13,908 |
| 2018 | 142,667 | 2,030,451 | 4.3% | 14,232 |
| 2017 | 79,543 | 1,149,353 | 2.4% | 14,450 |
| 2016 | 101,441 | 1,429,406 | 3.0% | 14,091 |
| 2015 | 85,913 | 1,244,926 | 2.6% | 14,490 |
| 2014 | 46,794 | 698,509 | 1.4% | 14,927 |
| 2013 (11 of 12 months) | 39,688 | 561,550 | — | 14,149 |
| 2012 | 79,821 | 1,117,747 | 2.4% | 14,003 |
| 2011 | 21,614 | 339,240 | 0.7% | 15,695 |
| 2010 | 45,979 | 661,003 | 1.4% | 14,376 |
| 2009 | 22,724 | 350,472 | 0.7% | 15,423 |
| 2008 | 51,696 | 786,338 | 1.5% | 15,211 |
| 2007 | 174,392 | 2,412,733 | 5.2% | 13,835 |
| 2006 | 97,254 | 1,366,163 | 2.9% | 14,047 |
| 2005 | 255,115 | 3,639,387 | 7.6% | 14,266 |
| 2004 | 18,317 | 271,417 | 0.5% | 14,818 |
| 2003 (11 of 12 months) | 27,029 | 416,054 | — | 15,393 |
| 2002 | 36,745 | 553,174 | 1.1% | 15,054 |
| 2001 | 40,969 | 622,237 | 1.2% | 15,188 |
How these are worked out
Net generation and fuel burned are the monthly figures EIA publishes in its bulk electricity file, from the plant's Form 923 reports; a year is the sum of its months. Capacity factor is a full year's net generation over today's nameplate capacity times the hours in that year (8,784 in a leap year), so a plant uprated or partly retired since reads against its current size; heat rate is fuel burned over net generation, for plants that burn fuel. A year with fewer than twelve months stated has no capacity factor, and a value outside the plausible range is left blank rather than shown. By month, the charts apply the same rules to each month's own hours and fuel.