Show on map
Conoco — Power plant · Gas, combustion turbine · Oklahoma Gas & Electric CoPonca City Refinery — Gas, other · OK · 5 MW · 2.9 km awaySooner — Coal · OK · 950 MW · 24.6 km away
  • Combustion
  • Retired
  • 10 · 100 · 1,000 MW

Power plant · Gas, combustion turbine

Key facts

Power plant · Gas, combustion turbineran 47% of 2005 Retired
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
1991
Net generation, 2005
272,652 MWh
Grid
SWPP
Location
Kay County, Oklahoma
Operated by
Oklahoma Gas & Electric CoSourceEIA-860M Preliminary Monthly Electric Generator Inventory

Output

Net generation MWh by year, 2001 to 2006
Fuel burned MMBtu by year, 2001 to 2006
  • Gas

Operations detail

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Gas, combustion turbine source: “Natural Gas Fired Combustion Turbine”
Age
35 years since 1991
1 attribute from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Balancing authority codeSWPP

Retirement

EIA-860M September 2026StatusEvery generator EIA lists at this plant has retired. As of EIA-860M for September 2026.
Retired
June 2006
Capacity retired
66 MW
Generators retired
2
Generators that retired or are scheduled to retire
GeneratorTechnologyNameplateStateDate
1Natural Gas Fired Combustion Turbine33 MWRetiredJune 2006
2Natural Gas Fired Combustion Turbine33 MWRetiredJune 2006

Grid

EIA-860 2025Grid fieldsAs the plant reported them to EIA-860 for 2025 (Schedule 2).
Balancing authority
Southwest Power Pool
NERC region
MRO
Transmission lines within 25 km (2)
Can the connection be reused?

A plant that retires usually leaves its substation, transmission connection and interconnection agreement behind, and those may be reusable by a new project at the same site. FERC Order No. 845 lets an interconnection customer use surplus interconnection service at an existing site, and some transmission providers' tariffs let a replacement resource take over a retiring unit's interconnection service, usually within a set time after the retirement. Whether any such right still exists here, who holds it and on what terms depends on the owner, the transmission provider and timing; this page does not establish any of that.

Timeline

  • Stated Units 1, 2 scheduled to retire, 66 MW · EIA-860M
  • In service · EIA-860M

Sources

4 sources

Sources EIA-860M · LBNL · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory

Sources

Every source and license · Attribution

View at source

Around this plant

Nearby

within 25 km
Projects within 25 km, nearest first.
ProjectKindAwayMW
Ponca City Refinery Postponed Gas, other 2.9 km 5
Sooner Postponed Coal 24.6 km 950

Sources EIA-860M

Sources

Attribution