Conroe
Power plant · Biomass
Key facts
Power plant · Biomass Retired- Capacity
- Capacity: sourceEIA-860M · Open licenseMW
- Commissioned
- 2003
- Net generation, 2011
- 0 MWh
- Grid
- 12 kV (MISO)
- Location
- Montgomery County, Texas
- Operated by
- TX LFG Energy, LPSourceEIA-860M Preliminary Monthly Electric Generator Inventory
Output
- Biomass and waste
Details
Who’s behind it
No companies named in filings yet.
Interested in this project?
Set an alert Book a call Join the beta
Our team gets you what you need.
Beta: private project space · data room · readiness check
- Technology
- Biomass source: “Landfill Gas”
- Age
- 23 years since 2003
1 attribute from EIA-860M Preliminary Monthly Electric Generator Inventory
| Attribute | Value |
|---|---|
| Balancing authority code | MISO |
Retirement
EIA-860M September 2026StatusEvery generator EIA lists at this plant has retired. As of EIA-860M for September 2026.- Retired
- April 2012
- Capacity retired
- 3 MW
- Generators retired
- 3
| Generator | Technology | Nameplate | State | Date |
|---|---|---|---|---|
| UNT1 | Landfill Gas | 1 MW | Retired | April 2012 |
| UNT2 | Landfill Gas | 1 MW | Retired | April 2012 |
| UNT3 | Landfill Gas | 1 MW | Retired | April 2012 |
Grid
EIA-860 2025Grid fieldsAs the plant reported them to EIA-860 for 2025 (Schedule 2).- Grid voltage at the plant
- 12 kV
- Balancing authority
- Midcontinent Independent Transmission System Operator, Inc..
- NERC region
- SERC
Transmission lines within 25 km (10)
- Entergy 138 kV line (OSM way 338937371)
- Entergy 138 kV line (OSM way 573060670)
- Entergy 230 kV line (OSM way 573060671)
- Entergy 138 kV line (OSM way 573060662)
- Entergy 230 kV line (OSM way 1250958074)
- Entergy 138 kV line (OSM way 1250958073)
- Entergy 230 kV line (OSM way 1250958072)
- Entergy 230 kV line (OSM way 1250958071)
- Entergy 138 kV line (OSM way 573060615)
- Entergy 230 kV line (OSM way 338937376)
Connection points within 25 km (2)
Can the connection be reused?
A plant that retires usually leaves its substation, transmission connection and interconnection agreement behind, and those may be reusable by a new project at the same site. FERC Order No. 845 lets an interconnection customer use surplus interconnection service at an existing site, and some transmission providers' tariffs let a replacement resource take over a retiring unit's interconnection service, usually within a set time after the retirement. Whether any such right still exists here, who holds it and on what terms depends on the owner, the transmission provider and timing; this page does not establish any of that.
Timeline
- Stated Units UNT1, UNT2, UNT3 scheduled to retire, 3 MW · EIA-860M
- In service · EIA-860M
Sources
5 sourcesSources EIA-860M · OpenStreetMap · ERCOT · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory
© OpenStreetMap contributors
Sources
- EIA-860M Preliminary Monthly Electric Generator Inventory
- OpenStreetMap power network, US — transmission lines and cables (69 kV and up, or voltage not tagged) and substations, from Geofabrik's US state extracts© OpenStreetMap contributors. Power lines, cables and substations filtered and reshaped by Inframation from the OpenStreetMap elements in Overture Maps' base/infrastructure theme; this derived database is available under the Open Database License 1.0 as GeoParquet files at https://tiles.inframation.io/grid/osm-power/ (latest.json names the current version's files; licence: https://www.openstreetmap.org/copyright)
- ERCOT GIS Report (Generator Interconnection Status)
- EIA Open Data bulk file — Electricity (ELEC.zip; monthly plant net generation and fuel consumption since 2001)Source: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)
- EIA-860M Preliminary Monthly Electric Generator Inventory
Around this plant
Nearby
within 25 km| Project | Kind | Away | MW |
|---|---|---|---|
| Lupinus Solar 1, LLC Under construction | Solar + storage | 15.2 km | 246.3 |
| Lupinus Solar 2, LLC Contracted | Solar + storage | 15.2 km | 366.9 |