Show on map
Copperton Solar Plant No. 1 — Power plant · Solar · Kennecott Utah CopperVAST DATA CENTER — Built · Large load · UT · 2.1 mi awayProject Sequoia- Data Center — Filed · Large load · UT · 2.6 mi awayCONDUENT DATA CENTER — Large load · UT · 9.4 mi awayKennecott Power Plant — Postponed · Gas, combined cycle · UT · 214.3 MW · 9.6 mi awayALIGNED DATA CENTER SLC-4 — Built · Large load · UT · 9.9 mi awayUTAH DATA CENTER — Built · Large load · UT · 12.8 mi away
  • Wind & solar
  • Loads
  • In development
  • Operating
  • Stage not stated
  • Size not stated
  • 10 · 100 · 1,000 MW

Copperton Solar Plant No. 1

Power plant · Solar

Key facts

Power plant · Solarran 3% of 2025 Operating
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
2024
Net generation, 2025
7,306 MWh
Grid
138 kV to PacifiCorp (PACE)
Location
Salt Lake County, Utah
Operated by
Kennecott Utah CopperSourceEIA-860M Preliminary Monthly Electric Generator Inventory

Output

Net generation MWh by year, 2024 to 2025

Operations detail

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Solar source: “Solar Photovoltaic”
Age
2 years since 2024
All 6 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Gem
Unit ids
G100000815206
Location id
L100000812574
Eia plant ids
64427
Grid
Nerc region
WECC
Report year
2025
Grid voltage kv
138
Transmission owner
PacifiCorp
Balancing authority code
PACE
Balancing authority name
PacifiCorp - East
Fuel burned (MMBtu), 202524,928
Capacity factor, 20250.028
Net generation (MWh), 20257,306
Balancing authority codePACE

Solar array

Array area (acres)
24.9
AC capacity (MW)
5
DC capacity (MW)
5.7
Mounting
Single-axis tracking
Site type
Greenfield
Began operating
2024

Source USPVDB

Source

  • USPVDBOpen license · retrieved Oct 25, 2026Map services and data are available from Large-Scale Solar Photovoltaic Database, provided by the U.S. Geological Survey and Lawrence Berkeley National Laboratory via https://energy.usgs.gov/uspvdb

Attribution

Timeline

  • In service · EIA-860M

Sources

5 sources

Sources EIA-860M · GEM · USPVDB · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026
  • GEMOpen license, with credit · retrieved Oct 26, 2026Global Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.
  • USPVDBOpen license · retrieved Oct 25, 2026Map services and data are available from Large-Scale Solar Photovoltaic Database, provided by the U.S. Geological Survey and Lawrence Berkeley National Laboratory via https://energy.usgs.gov/uspvdb
  • EIAOpen license · retrieved Nov 1, 2026Source: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)
  • EIA-860M Preliminary Monthly Electric Generator Inventory

Every source and license · Attribution

View at source

Around this plant

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
VAST DATA CENTER Built Large load 2.1 mi
Project Sequoia- Data Center Filed Large load 2.6 mi
CONDUENT DATA CENTER Unknown Large load 9.4 mi
Kennecott Power Plant Postponed Gas, combined cycle 9.6 mi 214.3
ALIGNED DATA CENTER SLC-4 Built Large load 9.9 mi
UTAH DATA CENTER Built Large load 12.8 mi

Sources EPA ICIS-NPDES · FAA OE/AAA · EIA-860M

Sources

Attribution