Show on map
Coral Energy Pipeline Co — Gas pipeline · Coral Energy Pipeline CoCrockett — Postponed · Storage · TX · 9.9 MW · 2.8 mi awayMartin Lake — Postponed · Coal · TX · 800 MW · 3.1 mi awayPiedra Solar — Under construction · Solar + storage · TX · 385.4 MW · 4.0 mi awayBig Brown — Postponed · Coal · TX · 800 MW · 4.2 mi awayHallsville — Announced · Gas, combustion turbine · TX · 450 MW · 4.4 mi awayAmerada — Studied · Solar + storage · TX · 452.4 MW · 6.3 mi awayAvant Prairie ESS — Studied · Storage · TX · 201.7 MW · 6.3 mi awayTimber Cove Solar — Studied · Solar · TX · 100.5 MW · 7.4 mi awayBrotherton Storage — Contracted · Storage · TX · 176.1 MW · 8.5 mi awayO'Bannion Energy Storage — Contracted · Storage · TX · 306.4 MW · 10.5 mi awayApache Hill Energy Center — Built · Storage · TX · 201.2 MW · 12.4 mi awayCN MITCHELL BEND DATA CENTER — Large load · TX · 12.7 mi awayApex Bethel Energy Center — Postponed · Storage · TX · 317 MW · 12.8 mi awayHouston County BESS — Studied · Storage · TX · 125.4 MW · 14.0 mi awayDeCordova Steam Electric Station — Postponed · Gas, combustion turbine · TX · 471 MW · 14.0 mi away
  • Combustion
  • Wind & solar
  • Storage
  • Loads
  • In development
  • Under construction
  • Operating
  • Stage not stated
  • Size not stated
  • Other infrastructure
  • 10 · 100 · 1,000 MW

Coral Energy Pipeline Co

Gas pipeline · intrastate

Key facts

Gas pipeline · intrastate Operating
Mapped route length
Mapped route length: sourceEIA Energy Atlas · Open licensemiles
Class
intrastate
States crossed
US-TX
Operated by
Coral Energy Pipeline CoSourceEIA US Energy Atlas — Natural Gas Interstate and Intrastate Pipelines (line geometries)

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert
More Book a call Join the beta
About these actionsOur team gets you what you need. Beta: private project space · data room · readiness check Want this as data? Free via the API and alerts.
Pipeline class
intrastate
Mapped route length (miles)
471
Technology
Intrastate source: “Intrastate”
Units
233
All 4 attributes from EIA US Energy Atlas — Natural Gas Interstate and Intrastate Pipelines (line geometries)
Attributes
AttributeValue
Mapped parts116
Status, as the source states itOperating
Mapped segments233
Source release202001

Around this pipeline

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
Crockett Postponed Storage 2.8 mi 9.9
Martin Lake Postponed Coal 3.1 mi 800
Piedra Solar Under construction Solar + storage 4.0 mi 385.4
Big Brown Postponed Coal 4.2 mi 800
Hallsville Announced Gas, combustion turbine 4.4 mi 450
Amerada Studied Solar + storage 6.3 mi 452.4
Avant Prairie ESS Studied Storage 6.3 mi 201.7
Timber Cove Solar Studied Solar 7.4 mi 100.5
Brotherton Storage Contracted Storage 8.5 mi 176.1
O'Bannion Energy Storage Contracted Storage 10.5 mi 306.4
Apache Hill Energy Center Built Storage 12.4 mi 201.2
CN MITCHELL BEND DATA CENTER Unknown Large load 12.7 mi
Apex Bethel Energy Center Postponed Storage 12.8 mi 317
Houston County BESS Studied Storage 14.0 mi 125.4
DeCordova Steam Electric Station Postponed Gas, combustion turbine 14.0 mi 471

Sources EIA-860M · ERCOT · EPA ICIS-NPDES

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026
  • ERCOTOpen license · retrieved Nov 4, 2026
  • EPA ICIS-NPDESOpen license · retrieved Nov 16, 2026

Attribution