- Combustion
- Operating
- 10 · 100 · 1,000 MW
Map
- Combustion
- Operating
Corewell Health Dearborn Campus: location. Basemap: Protomaps, © OpenStreetMap contributors, ODbL.
Corewell Health Dearborn Campus
Power plant · Oil
Key facts
Power plant · Oilran 0% of 2025 Standby- Capacity
- Capacity: sourceEIA-860M · Open licenseMW
- Commissioned
- 2006
- Net generation, 2025
- 42 MWh
- Grid
- 230 kV, 120 kV to DTE Electric Company (MISO)
- Location
- Wayne County, Michigan
- Operated by
- Corewell Health Dearborn CampusSourceEIA-860M Preliminary Monthly Electric Generator Inventory
Operations
- Net generation, 2025
- 42
MWh - Fuel burned, 2025
- 684
MMBtu - Capacity factor, 2025
- 0.1
% - Heat rate, 2025
- 16,286
Btu/kWh
| Year | Net generation (MWh) | Fuel burned (MMBtu) | Capacity factor | Heat rate (Btu/kWh) |
|---|---|---|---|---|
| 2025 | 42 | 684 | 0.1% | 16,286 |
| 2023 | 30 | 511 | 0.1% | 17,033 |
| 2022 | 53 | 721 | 0.1% | 13,604 |
| 2021 | 42 | 683 | 0.1% | 16,262 |
| 2020 | 32 | 429 | 0.1% | 13,265 |
| 2019 | 21 | 437 | 0.1% | 20,810 |
| 2018 | 22 | 312 | 0.1% | 14,182 |
| 2017 | 20 | 287 | 0.1% | 14,350 |
| 2016 | 21 | 236 | 0.1% | 11,238 |
| 2015 | 14 | 342 | 0.0% | 24,429 |
| 2014 | 13 | 329 | 0.0% | 25,308 |
| 2013 | 13 | 329 | 0.0% | 25,308 |
| 2012 | 13 | 610 | 0.0% | — |
| 2011 | 13 | 605 | 0.0% | — |
| 2010 | 13 | 586 | 0.0% | — |
| 2009 | 12 | 220 | 0.0% | 18,333 |
| 2008 | 12 | 220 | 0.0% | 18,333 |
| 2007 | 12 | 141 | 0.0% | 11,751 |
| 2006 | 12 | 219 | 0.0% | 18,248 |
| 2004 | 1,778 | 24,802 | 4.5% | 13,952 |
| 2002 | 8,931 | 105,969 | 22.7% | 11,866 |
| 2001 | 7,184 | 93,657 | 18.2% | 13,037 |
How these are worked out
Net generation and fuel burned are the monthly figures EIA publishes in its bulk electricity file, from the plant's Form 923 reports; a year is the sum of its months. Capacity factor is a full year's net generation over today's nameplate capacity times the hours in that year (8,784 in a leap year), so a plant uprated or partly retired since reads against its current size; heat rate is fuel burned over net generation, for plants that burn fuel. A year with fewer than twelve months stated has no capacity factor, and a value outside the plausible range is left blank rather than shown. By month, the charts apply the same rules to each month's own hours and fuel.