Corewell Health Dearborn Campus — Power plant · Oil · Corewell Health Dearborn CampusCity of Detroit Greenfield — Permitted · Solar · MI · 7 MW · 10.6 mi awayEast Windsor cogeneration centre 2 — Under construction · Gas, combustion turbine · Canada · 100 MW · 11.0 mi awayTrenton Channel Energy Center — Under construction · Storage · MI · 220 MW · 11.6 mi awayProject Cannoli Data Center — Filed · Large load · MI · 12.2 mi away123NET — Built · Large load · MI · 12.5 mi awayCity of Detroit Castle Solar — Under construction · Solar · MI · 10 MW · 12.9 mi away
  • Combustion
  • Wind & solar
  • Storage
  • Loads
  • In development
  • Under construction
  • Operating
  • Size not stated
  • 10 · 100 · 1,000 MW

Corewell Health Dearborn Campus

Power plant · Oil

Key facts

Power plant · Oilran 0% of 2025 Standby
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
2006
Net generation, 2025
42 MWh
Grid
230 kV, 120 kV to DTE Electric Company (MISO)
Location
Wayne County, Michigan
Operated by
Corewell Health Dearborn CampusSourceEIA-860M Preliminary Monthly Electric Generator Inventory

Output

Net generation MWh by year, 2001 to 2025
Fuel burned MMBtu by year, 2001 to 2025
  • Gas
  • Oil

Operations detail

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Oil source: “Petroleum Liquids”
Age
20 years since 2006
Heat rate
16,286 Btu/kWh 2025
All 6 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Eia status
By code
SB
Mw
4.50
Units
3
Standby mw
4.50
Status rule
majority_mw_standby
In service mw
4.50
Out of service mw
0
Fuel burned (MMBtu), 2025684
Capacity factor, 20250.001
Heat rate (Btu/kWh), 202516,285.7
Net generation (MWh), 202542
Balancing authority codeMISO

Retirement

Capacity retired
2.3 MW
Generators retired
5
Capacity still in service
4.5 MW
Generators that retired or are scheduled to retire
GeneratorTechnologyNameplateStateDate
EG#1Natural Gas Internal Combustion Engine0.5 MWRetiredOctober 2004
EG#2Natural Gas Internal Combustion Engine0.5 MWRetiredOctober 2004
EG#3Natural Gas Internal Combustion Engine0.5 MWRetiredOctober 2004
300KWPetroleum Liquids0.3 MWRetiredAugust 2005
500KWPetroleum Liquids0.5 MWRetiredSeptember 2019
By technology
Nameplate capacity retired or scheduled to retire, by technology
TechnologyRetiredScheduled to retire
Natural Gas Internal Combustion Engine1.5 MW
Petroleum Liquids0.8 MW

Grid

EIA-860 2025Grid fieldsAs the plant reported them to EIA-860 for 2025 (Schedule 2).
Grid voltage at the plant
230 kV, 120 kV
Transmission or distribution system owner
DTE Electric Company
Balancing authority
Midcontinent Independent Transmission System Operator, Inc..
NERC region
RFC
Transmission lines within 15 mi (10)
Can the connection be reused?

A plant that retires usually leaves its substation, transmission connection and interconnection agreement behind, and those may be reusable by a new project at the same site. FERC Order No. 845 lets an interconnection customer use surplus interconnection service at an existing site, and some transmission providers' tariffs let a replacement resource take over a retiring unit's interconnection service, usually within a set time after the retirement. Whether any such right still exists here, who holds it and on what terms depends on the owner, the transmission provider and timing; this page does not establish any of that.

Timeline

  • Stated Unit 500KW scheduled to retire, 0.5 MW · EIA-860M
  • In service · EIA-860M
  • Stated Unit 300KW scheduled to retire, 0.3 MW · EIA-860M
  • Stated Units EG#1, EG#2, EG#3 scheduled to retire, 1.5 MW · EIA-860M

Sources

4 sources

Sources EIA-860M · LBNL · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026
  • LBNLOpen license, with credit · retrieved Nov 13, 2026Yin, Nait Belaid & Heleno (2026), Lawrence Berkeley National Laboratory, OEDI, CC BY 4.0: A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024. Modified by Inframation: HIFLD-side fields only, names re-cased, coordinates rounded.
  • EIAOpen license · retrieved Nov 1, 2026Source: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)
  • EIA-860M Preliminary Monthly Electric Generator Inventory

Every source and license · Attribution

View at source

Around this plant

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
City of Detroit Greenfield Permitted Solar 10.6 mi 7
East Windsor cogeneration centre 2 Under construction Gas, combustion turbine 11.0 mi 100
Trenton Channel Energy Center Under construction Storage 11.6 mi 220
Project Cannoli Data Center Filed Large load 12.2 mi
123NET Built Large load 12.5 mi
City of Detroit Castle Solar Under construction Solar 12.9 mi 10

Sources EIA-860M · GEM · Berkeley Lab · FAA OE/AAA · EPA ICIS-Air

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026
  • GEMOpen license, with credit · retrieved Oct 26, 2026Global Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.
  • Berkeley LabOpen license, with credit · retrieved Nov 4, 2026Lawrence Berkeley National Laboratory and GridTracker, Queued Up data file (2026 edition), CC BY 4.0. Modified by Inframation: non-ISO and MISO regions only; MISO rows labelled with the date the file's queue data runs to; statuses and technologies mapped to Inframation's vocabulary. Queued Up Data File. Copyright (c) 2026, The Regents of the University of California, through Lawrence Berkeley National Laboratory (subject to receipt of any required approvals from the U.S. Dept. of Energy) & GridTracker.
  • FAA OE/AAAOpen license · retrieved Nov 16, 2026
  • EPA ICIS-AirOpen license · retrieved Nov 16, 2026

Attribution