Corewell Health Dearborn Campus
Power plant · Oil
Key facts
Power plant · Oilran 0% of 2025 Standby- Capacity
- Capacity: sourceEIA-860M · Open licenseMW
- Commissioned
- 2006
- Net generation, 2025
- 42 MWh
- Grid
- 230 kV, 120 kV to DTE Electric Company (MISO)
- Location
- Wayne County, Michigan
- Operated by
- Corewell Health Dearborn CampusSourceEIA-860M Preliminary Monthly Electric Generator Inventory
Output
- Gas
- Oil
Details
Who’s behind it
No companies named in filings yet.
Interested in this project?
Set an alert Book a call Join the beta
Our team gets you what you need.
Beta: private project space · data room · readiness check
- Technology
- Oil source: “Petroleum Liquids”
- Age
- 20 years since 2006
- Heat rate
- 16,286 Btu/kWh 2025
All 6 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
| Attribute | Value |
|---|---|
| Eia status |
|
| Fuel burned (MMBtu), 2025 | 684 |
| Capacity factor, 2025 | 0.001 |
| Heat rate (Btu/kWh), 2025 | 16,285.7 |
| Net generation (MWh), 2025 | 42 |
| Balancing authority code | MISO |
Retirement
- Capacity retired
- 2.3 MW
- Generators retired
- 5
- Capacity still in service
- 4.5 MW
| Generator | Technology | Nameplate | State | Date |
|---|---|---|---|---|
| EG#1 | Natural Gas Internal Combustion Engine | 0.5 MW | Retired | October 2004 |
| EG#2 | Natural Gas Internal Combustion Engine | 0.5 MW | Retired | October 2004 |
| EG#3 | Natural Gas Internal Combustion Engine | 0.5 MW | Retired | October 2004 |
| 300KW | Petroleum Liquids | 0.3 MW | Retired | August 2005 |
| 500KW | Petroleum Liquids | 0.5 MW | Retired | September 2019 |
By technology
| Technology | Retired | Scheduled to retire |
|---|---|---|
| Natural Gas Internal Combustion Engine | 1.5 MW | |
| Petroleum Liquids | 0.8 MW |
Grid
EIA-860 2025Grid fieldsAs the plant reported them to EIA-860 for 2025 (Schedule 2).- Grid voltage at the plant
- 230 kV, 120 kV
- Transmission or distribution system owner
- DTE Electric Company
- Balancing authority
- Midcontinent Independent Transmission System Operator, Inc..
- NERC region
- RFC
Transmission lines within 15 mi (10)
- Crestwood 120 kV line
- Dearborn Industrial Generation 230 kV line
- Brownstown 230 kV line
- Delray 120 kV line
- Detroit Edison King Road 120 kV line
- Detroit Edison King Road 120 kV line
- Trenton Channel - Detroit Edison King Road 120 kV
- Detroit Edison King Road 120 kV line
- Detroit Edison King Road 120 kV line
- Southfield 120 kV line
Can the connection be reused?
A plant that retires usually leaves its substation, transmission connection and interconnection agreement behind, and those may be reusable by a new project at the same site. FERC Order No. 845 lets an interconnection customer use surplus interconnection service at an existing site, and some transmission providers' tariffs let a replacement resource take over a retiring unit's interconnection service, usually within a set time after the retirement. Whether any such right still exists here, who holds it and on what terms depends on the owner, the transmission provider and timing; this page does not establish any of that.
Timeline
- Stated Unit 500KW scheduled to retire, 0.5 MW · EIA-860M
- In service · EIA-860M
- Stated Unit 300KW scheduled to retire, 0.3 MW · EIA-860M
- Stated Units EG#1, EG#2, EG#3 scheduled to retire, 1.5 MW · EIA-860M
Sources
4 sourcesSources EIA-860M · LBNL · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory
Sources
- EIA-860M
- LBNLYin, Nait Belaid & Heleno (2026), Lawrence Berkeley National Laboratory, OEDI, CC BY 4.0: A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024. Modified by Inframation: HIFLD-side fields only, names re-cased, coordinates rounded.
- EIASource: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)
- EIA-860M Preliminary Monthly Electric Generator Inventory
Around this plant
Nearby
within 15 mi| Project | Kind | Away | MW |
|---|---|---|---|
| City of Detroit Greenfield Permitted | Solar | 10.6 mi | 7 |
| East Windsor cogeneration centre 2 Under construction | Gas, combustion turbine | 11.0 mi | 100 |
| Trenton Channel Energy Center Under construction | Storage | 11.6 mi | 220 |
| Project Cannoli Data Center Filed | Large load | 12.2 mi | |
| 123NET Built | Large load | 12.5 mi | |
| City of Detroit Castle Solar Under construction | Solar | 12.9 mi | 10 |
Sources EIA-860M · GEM · Berkeley Lab · FAA OE/AAA · EPA ICIS-Air
Sources
- EIA-860M
- GEMGlobal Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.
- Berkeley LabLawrence Berkeley National Laboratory and GridTracker, Queued Up data file (2026 edition), CC BY 4.0. Modified by Inframation: non-ISO and MISO regions only; MISO rows labelled with the date the file's queue data runs to; statuses and technologies mapped to Inframation's vocabulary. Queued Up Data File. Copyright (c) 2026, The Regents of the University of California, through Lawrence Berkeley National Laboratory (subject to receipt of any required approvals from the U.S. Dept. of Energy) & GridTracker.
- FAA OE/AAA
- EPA ICIS-Air