- Bioenergy
- Operating
- 10 · 100 · 1,000 MW
Map
- Bioenergy
- Operating
Coventry Clean Energy Corporation: location. Basemap: Protomaps, © OpenStreetMap contributors, ODbL.
Coventry Clean Energy Corporation
Power plant · Biomass
Key facts
Power plant · Biomassran 82% of 2025 Operating- Capacity
- Capacity: sourceEIA-860M · Open licenseMW
- Commissioned
- 2005
- Net generation, 2025
- 57,387 MWh
- Grid
- 46 kV to Washington Electric Coop - (VT) (ISNE)
- Location
- Orleans County, Vermont
- Operated by
- Washington Electric Coop - (VT)SourceEIA-860M Preliminary Monthly Electric Generator Inventory
Operations
- Net generation, 2025
- 57,387
MWh - Fuel burned, 2025
- 690,273
MMBtu - Capacity factor, 2025
- 81.9
% - Heat rate, 2025
- 12,028
Btu/kWh
| Year | Net generation (MWh) | Fuel burned (MMBtu) | Capacity factor | Heat rate (Btu/kWh) |
|---|---|---|---|---|
| 2025 | 57,387 | 690,273 | 81.9% | 12,028 |
| 2024 | 49,484 | 576,475 | 70.4% | 11,650 |
| 2023 | 51,856 | 545,638 | 74.0% | 10,522 |
| 2022 | 48,801 | 496,181 | 69.6% | 10,167 |
| 2021 | 53,646 | 565,764 | 76.5% | 10,546 |
| 2020 | 58,170 | 598,126 | 82.8% | 10,282 |
| 2019 | 55,727 | 516,236 | 79.5% | 9,264 |
How these are worked out
Net generation and fuel burned are the monthly figures EIA publishes in its bulk electricity file, from the plant's Form 923 reports; a year is the sum of its months. Capacity factor is a full year's net generation over today's nameplate capacity times the hours in that year (8,784 in a leap year), so a plant uprated or partly retired since reads against its current size; heat rate is fuel burned over net generation, for plants that burn fuel. A year with fewer than twelve months stated has no capacity factor, and a value outside the plausible range is left blank rather than shown. By month, the charts apply the same rules to each month's own hours and fuel.