Show on map
- Combustion
- Wind & solar
- Storage
- Loads
- In development
- Under construction
- Operating
- Stage not stated
- Size not stated
- 10 · 100 · 1,000 MW
Map
- Combustion
- Wind & solar
- Storage
- Loads
- In development
- Under construction
- Operating
- Stage not stated
- Size not stated
Crosby Clean Energy Center (BESS): location and 8 exact-grade projects within 15 mi. Basemap: Protomaps, © OpenStreetMap contributors, ODbL.
Crosby Clean Energy Center (BESS)
Power plant · Storage
Key facts
Power plant · Storage Operating- Capacity
- Capacity: sourceEIA-860M · Open licenseMW
- Commissioned
- 2025
- Net generation, 2025
- -409 MWh
- Grid
- 12 kV to CenterPoint Energy (ERCO)
- Location
- Harris County, Texas
- Operated by
- On Energy StorageSourceEIA-860M Preliminary Monthly Electric Generator Inventory
Output
Details
Who’s behind it
No companies named in filings yet.
Interested in this project?
Set an alert Book a call Join the beta
Our team gets you what you need.
Beta: private project space · data room · readiness check
- Technology
- Storage source: “Batteries”
- Age
- 1 year since 2025
All 4 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
| Attribute | Value |
|---|---|
| Grid |
|
| Fuel burned (MMBtu), 2025 | 0 |
| Net generation (MWh), 2025 | -409 |
| Balancing authority code | ERCO |
Data notes (1)
- Capacity factor, 2025 not shown: net generation -409.0 MWh is not positive (the plant consumed at least as much as it produced over the year)
Timeline
- In service · EIA-860M
Sources
3 sourcesSources EIA-860M · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory
Sources
- EIA-860M
- EIASource: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)
- EIA-860M Preliminary Monthly Electric Generator Inventory
Around this plant
Nearby
within 15 mi| Project | Kind | Away | MW |
|---|---|---|---|
| Noor Solar Filed | Solar | 3.8 mi | 188.2 |
| Coneflower Storage Project LLC Contracted | Storage | 5.6 mi | 170.8 |
| GCCISD NEW TECHNOLOGY DATA CENTER Unknown | Large load | 6.5 mi | |
| Cedar Bayou 5 Under construction | Gas, combustion turbine | 10.2 mi | 697 |
| CPV Pondera King Energy Center Postponed | Gas, combined cycle | 12.3 mi | 900 |
| Greens Bayou 6 Under construction | Gas, combustion turbine | 12.6 mi | 445 |
| TX LaPort 10060 Porter Road Solar Postponed | Solar | 12.7 mi | 1.6 |
| TX Houston 7080 Express Lane Postponed | Storage | 14.2 mi | 1.5 |
Sources EIA-860M · ERCOT · EPA ICIS-NPDES