Show on map
Crystal River — Power plant · Gas, combined cycle · Duke Energy Florida, LLCPowerline Energy Storage — Under construction · Storage · FL · 100 MW · 7.8 km awayLevy Nuclear Plant — Withdrawn · Nuclear · FL · 2,500 MW · 14.0 km away
  • Combustion
  • Storage
  • Under construction
  • Operating
  • 10 · 100 · 1,000 MW

Crystal River

Power plant · Gas, combined cycle

Key facts

Power plant · Gas, combined cycleran 51% of 2025 Operating
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
1982
Net generation, 2025
15,307,405 MWh
Grid
500 kV to Duke Energy Florida, Inc (FPC)
Location
Citrus County, Florida

Output

Net generation MWh by year, 2001 to 2026
Fuel burned MMBtu by year, 2001 to 2026
  • Gas
  • Coal
  • Oil
  • Nuclear

Operations detail

Details

Who’s behind it

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Gas, combined cycle source: “Natural Gas Fired Combined Cycle”
Age
44 years since 1982
Unused energy
14,907 GWh 2025Unused energyA lead, not a guarantee: MW × hours × (1 − capacity factor) for the latest year (EIA-923), gas, coal and oil plants only. Air-permit run-hour caps, heat rate (cost to run) and capacity-market or reliability obligations can rule it out.
Heat rate
7,789 Btu/kWh 2025
All 6 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
EPA greenhouse gas reporting (GHGRP)
EPA FRS ID
110017431215
Subparts reported
C, D, TT
NAICS code
221112
Subpart PP (CO2 supply)
No
Subpart RR (geologic sequestration)
No
Subpart UU (CO2 injection)
No
Reporting year
2023
GHGRP facility ID
1001487
Fuel burned (MMBtu), 2025119,230,660
Capacity factor, 20250.507
Heat rate (Btu/kWh), 20257,789.1
Net generation (MWh), 202515,307,405.0
Balancing authority codeFPC

Retirement

EIA-860M September 2026StatusSome generators are scheduled to retire; most of the plant's capacity is not, so it is shown as operating. As of EIA-860M for September 2026.
Capacity retired
1,854.7 MW
Generators retired
3
Next scheduled retirement
June 2034
Capacity scheduled to retire
1,478.4 MW
Generators scheduled to retire
2
Share of in-service capacity scheduled
43%
Capacity still in service
3,449 MW
Generators that retired or are scheduled to retire
GeneratorTechnologyNameplateStateDate
3Nuclear890.4 MWRetiredFebruary 2013
1Conventional Steam Coal440.5 MWRetiredDecember 2018
2Conventional Steam Coal523.8 MWRetiredDecember 2018
5Conventional Steam Coal739.2 MWScheduled to retireJune 2034
ST4Conventional Steam Coal739.2 MWScheduled to retireJune 2034
By technology
Nameplate capacity retired or scheduled to retire, by technology
TechnologyRetiredScheduled to retire
Conventional Steam Coal964.3 MW1,478.4 MW
Nuclear890.4 MW

Grid

EIA-860 2025Grid fieldsAs the plant reported them to EIA-860 for 2025 (Schedule 2).
Grid voltage at the plant
500 kV
Transmission or distribution system owner
Duke Energy Florida, Inc
Balancing authority
Progress Energy Florida
NERC region
SERC
Transmission lines within 25 km (9)
Can the connection be reused?

A plant that retires usually leaves its substation, transmission connection and interconnection agreement behind, and those may be reusable by a new project at the same site. FERC Order No. 845 lets an interconnection customer use surplus interconnection service at an existing site, and some transmission providers' tariffs let a replacement resource take over a retiring unit's interconnection service, usually within a set time after the retirement. Whether any such right still exists here, who holds it and on what terms depends on the owner, the transmission provider and timing; this page does not establish any of that.

Ownership

5 companies6
Companies with an ownership or operating interest in this asset.
CompanyRoleShareAs ofSource
Duke Energy Florida, LLC Operator EIA-860M
Duke Energy Owner 100.0% Dec 31, 2023 EPA GHGRP
Duke Energy Florida, LLC Owner Dec 31, 2025 EIA-860
Orlando Utilities Comm Owner Dec 31, 2025 EIA-860
Seminole Electric Cooperative Inc Owner Dec 31, 2025 EIA-860
Several Municipals and Coops Owner Dec 31, 2025 EIA-860

Timeline

  • Stated Units 5, ST4 scheduled to retire, 1,478.4 MW · EIA-860M
  • Stated Units 1, 2 scheduled to retire, 964.3 MW · EIA-860M
  • Stated Unit 3 scheduled to retire, 890.4 MW · EIA-860M
  • In service · EIA-860M

Sources

6 sources

Sources EIA-860M · LBNL · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory · EPA Greenhouse Gas Reporting Program — facility register with parent-company shares (Envirofacts pub_dim_facility; FLIGHT) · EIA-860 Annual Electric Generator Report — Schedule 4 Owner (ownership shares per generator), plus Plant/Generator schedules

Sources

Every source and license · Attribution

View at source

Around this plant

Nearby

within 25 km
Projects within 25 km, nearest first.
ProjectKindAwayMW
Powerline Energy Storage Under construction Storage 7.8 km 100
Levy Nuclear Plant Withdrawn Nuclear 14.0 km 2,500

Sources EIA-860M · Berkeley Lab · Permitting Dashboard

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026
  • Berkeley LabOpen license, with credit · retrieved Nov 4, 2026Lawrence Berkeley National Laboratory and GridTracker, Queued Up data file (2026 edition), CC BY 4.0. Modified by Inframation: non-ISO and MISO regions only; MISO rows labelled with the date the file's queue data runs to; statuses and technologies mapped to Inframation's vocabulary. Queued Up Data File. Copyright (c) 2026, The Regents of the University of California, through Lawrence Berkeley National Laboratory (subject to receipt of any required approvals from the U.S. Dept. of Energy) & GridTracker.
  • Permitting DashboardOpen license · retrieved Nov 8, 2026

Attribution