CSUF Trigeneration — Power plant · Gas, combustion turbine · California State University at FullertonMarici — Under construction · Storage · CA · 400 MW · 9.4 mi awayWestminster Reliability Project, LLC — Under construction · Storage · CA · 110 MW · 10.3 mi awaySanta Ana Storage 3 — Postponed · Storage · CA · 40 MW · 11.6 mi awayVS HR Warner NEM, LLC — Under construction · Solar · CA · 1 MW · 11.7 mi awaySolar Photovoltaic Project #47 — Postponed · Solar · CA · 1 MW · 12.3 mi awayCPA 3777 Workman — Postponed · Solar · CA · 1.9 MW · 13.1 mi away
  • Combustion
  • Wind & solar
  • Storage
  • Under construction
  • Operating
  • 10 · 100 · 1,000 MW

CSUF Trigeneration

Power plant · Gas, combustion turbine

Key facts

Power plant · Gas, combustion turbineran 47% of 2025 Operating
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
2010
Net generation, 2025
36,664 MWh
Grid
66 kV to Southern California Edison Co (CISO)
Location
Orange County, California
Operated by
California State University at FullertonSourceEIA-860M Preliminary Monthly Electric Generator Inventory

Output

Net generation MWh by year, 2012 to 2026
Fuel burned MMBtu by year, 2012 to 2026
  • Gas

Operations detail

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Gas, combustion turbine source: “Natural Gas Fired Combustion Turbine”
Age
16 years since 2010
Unused energy
41 GWh 2025Unused energyA lead, not a guarantee: MW × hours × (1 − capacity factor) for the latest year (EIA-923), gas, coal and oil plants only. Air-permit run-hour caps, heat rate (cost to run) and capacity-market or reliability obligations can rule it out.
Heat rate
9,469 Btu/kWh 2025
All 7 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Gem
Unit ids
G100000815302, G100000815303
Location id
L100000812655
Eia plant ids
58169
Grid
Nerc region
WECC
Report year
2025
Grid voltage kv
66
Transmission owner
Southern California Edison Co
Balancing authority code
CISO
Balancing authority name
California Independent System Operator
Fuel burned (MMBtu), 2025347,168
Capacity factor, 20250.470
Heat rate (Btu/kWh), 20259,468.9
Net generation (MWh), 202536,664
Balancing authority codeCISO

Solar arrays

Array area (acres)
3.8
AC capacity (MW)
4.3
DC capacity (MW)
5
Mounting
Fixed tilt
Site type
Greenfield
Began operating
2012

Source USPVDB

Source

  • USPVDBOpen license · retrieved Oct 25, 2026Map services and data are available from Large-Scale Solar Photovoltaic Database, provided by the U.S. Geological Survey and Lawrence Berkeley National Laboratory via https://energy.usgs.gov/uspvdb

Attribution

Timeline

  • In service · EIA-860M

Sources

5 sources

Sources EIA-860M · GEM · USPVDB · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026
  • GEMOpen license, with credit · retrieved Oct 26, 2026Global Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.
  • USPVDBOpen license · retrieved Oct 25, 2026Map services and data are available from Large-Scale Solar Photovoltaic Database, provided by the U.S. Geological Survey and Lawrence Berkeley National Laboratory via https://energy.usgs.gov/uspvdb
  • EIAOpen license · retrieved Nov 1, 2026Source: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)
  • EIA-860M Preliminary Monthly Electric Generator Inventory

Every source and license · Attribution

View at source

Around this plant

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
Marici Under construction Storage 9.4 mi 400
Westminster Reliability Project, LLC Under construction Storage 10.3 mi 110
Santa Ana Storage 3 Postponed Storage 11.6 mi 40
VS HR Warner NEM, LLC Under construction Solar 11.7 mi 1
Solar Photovoltaic Project #47 Postponed Solar 12.3 mi 1
CPA 3777 Workman Postponed Solar 13.1 mi 1.9

Sources EIA-860M · CAISO